My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-16-1900 Planning Packet
Orono
>
Planning Commission
>
1990
>
04-16-1900 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2022 9:17:41 AM
Creation date
12/1/2022 9:11:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
246
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Operational Evolution <br />The renovation and reconstruction of the Camp will proceed in three general <br />phases: <br />Phase 1 - Day and overnight tent camping facilities <br />Phase 2 - Handicapped accessible cabin construction <br />Phase 3 - Operational enhancement <br />Some projects within a given phase may overlap another phase; however, the <br />overall strategy is an orderly evolut'on of operational capabilities. <br />Reconstruction and Renovation Areas <br />1. Southeast (SE) Area - Point Charming <br />2. Northeast (NE) Area - East of Peanut Row <br />includes Peanut Row latrine site <br />3. North and Central (NC) Area - Includes all old buildings other <br />than Peanut Row and Point Charming <br />latrines <br />4. Dock and Playground (DP) Area - Immediately west and southwest <br />of main pavilion <br />5. Northwest (NW) Area - northwest and west of playground <br />(See attached map #1) <br />Overall Concept <br />Construct new picnic shelters and latrine/shower buildings to support day <br />and overnight tent camping use. Renovate old main dining hall for use as <br />a visitor's center and repair other existing storage buildings as necessary. <br />Construct 15 handicapped accessible caoins in SE area. Expand services and <br />buildings in NE and NW areas if required for additional day, tent or cabin <br />use. <br />Phase One - Scope and Projects <br />Phase 1 - Day and overnight tent camping facilities <br />This phase provides for the erection of new picnic and bathroom buildings <br />with new septic tanks and fields as camp use increases. This phase also <br />includes renovation of existing bu'idings.
The URL can be used to link to this page
Your browser does not support the video tag.