My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info - 1983
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
170 Big Island - PID: 23-117-23-23-0029
>
Septic
>
Septic info - 1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:12:43 PM
Creation date
9/17/2015 2:02:46 PM
Metadata
Fields
Template:
x Address Old
House Number
170
Street Name
Big Island
Address
170 Big Island
Document Type
Septic
PIN
2311723230029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 19� 1983 Job # 1980 <br /> Specifications� lots 31 & 32 Pa�;e 2 of 3 <br /> TREATMENT AREAs <br /> The treatment area will consist of a drainfield using SB2 tubir�g manufactured <br /> by ADS (Advanced Drainage Systems Inc). The drainfield will consist of six <br /> sections of SB2 tubing� each 20 feet long� installed in separate trenches that <br /> are separated from each other end to end by not less than 5 feet. The SB2 <br /> tubing shall be not closer than 8 feet when measured from center line to <br /> center line. The drainfield will be installed at approximately the area <br /> shown on the attached location plan� althou�;h some variation can be permitted <br /> to allow site adaption to local site features. The diameter of the tubing <br /> shall be a nominal 10 inches. <br /> The tubing shall be installed in trenches dug in the natural soil to bottom <br /> elevations of from ]b to 21� inches below existing grade. The trench width <br /> shall be 2I� inches, and the sides of the trenches shall be scarified and loose <br /> material removed prior to installing the tubing. The bottom of each 20 foot <br /> trench shaly be level, and the SB2 tubing shall be i.nstalled level in the <br /> trench. The individual sections of SB2 tubing shall be conne�ted in series <br /> so that distribution to subsequent sections occurs only after each section <br /> is filled to capaeity. The distribution sha 11 he accomplished by capping <br /> the end of each section and drawing off the top half with a solid 1t inch <br /> PVC pipe. This !t" pipe shall distribute to the next section of SB2 tubing, <br /> the invert of which will be level with or lower than the invert of the <br /> 20 foot section immediately preceeding it in lineo Excavation between <br /> individual 20 foot sections of SB2 �ubing sha11 be the minimum necessary <br /> to install the distribution pipe. It is intended that there be an earth <br /> dam of natural, undisturbed soil separating each individual 20 foo-� section <br /> of SB2 tubing. See the attached installation detail sketch. <br /> Each of the separate 20 foot sections of SB2 tubing shall have an inspection <br /> pipe installed, generally at the downstream end as indicated in the installation <br /> detail sketch. The inspec�ion pipe shall be a solid I� inch PVC pipe, cap�d <br /> at grade. A screw type inspection cap with appropriate fitting to the pipe <br /> shall be used so that a tight closure can be readily obtained after each <br /> inspection. The inspection opening sha1.1 penetrate the top of the SB2 tubing <br /> and the !� inch inspection pipe sha11 be secured above this opening to permit <br /> proper inspect?on into the bottom of the SB2 tubing. The opening shall be <br /> protected from infiltration of soil fill, The natural� excavated soil shall <br /> be used �o backfill the trenches at completion of the installation. The soil <br /> shall be loosely placed without compacting� and the finished installation shall <br /> be mounded over the tre.nch to accomodate future settling. -The location of the <br /> inspection pipe shall be marked by driving a 3/1.G inch st,eel pipe 6 inches belo�•r <br /> grade at the bottom and 1 i.nch above grade at the top. The st,eel pipe shall <br /> be driven immediately adjacent to the 1� inch i.nspection pipe. Steel s�all <br /> be used to facilitate future location with metal detectors. <br /> TOM SMITH ASSOCIATES inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.