My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-03-1977 Planning Packet
Orono
>
Planning Commission
>
1977
>
01-03-1977 Planning Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 1:39:24 PM
Creation date
10/19/2022 9:10:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"cil actions <br />,e that he <br />lardshe 11 and <br />late r i al on <br />an on -s i to <br />oketch only <br />;bore setback <br />,os i t ion on <br />him of no <br />ff evidently <br />n over con - <br />by Vi l We <br />his distress <br />Copy sent <br />0. <br />11 tie rm i t . <br />id wall are <br />I f in _is no <br />letters from <br />schedule for <br />difficulty ih <br />er. Requested <br />n ing economic <br />w Village <br />application <br />of procedures <br />.11 permit <br />U. without <br />��• c •a f rc%• - 1(�n � T �` 1 e wo�►a West � <br />• L. S, for McCaffrey rey subd i v i s ion <br />2S a May 10 , 19 74 _ Mlemm Eton Marston to Cosby stating R. d to <br />• ci 1 act ion . However, the map I find attache <br />a is c ilete and readv for Cou1 <br />°� s e let alone a mylar or hardsltell. If We <br />memo is only a sketch - not even a . ury y, have a roved a plat that <br />ell on file, we pp S. .Tants.3n• <br />don't have the proper myl ar and hardsh 1 was never made _ . <br />' e thin is that a survey probah y rev 15 l O <br />does not meet requirements. On g . <br />• resulted in damn es to another neighbor, w.� 11 ` 1 <br />I wi 11 mint out later how this may have resul R <br />Mr. Skarp. ) <br />60 J antia ry <br />26. Jwie 14, 1974 Letter from MICR f f rey to informing him of periodic changes t clrairiag <br />in structure - feels it unimportant. <br />7. JWujary <br />_ pert ",li tchel l , representing McNeil, • to , •IcC'.a f frey <br />27. July ..3, 1 �74 Letter from Robert final grading. A t <br />ardin meetingon site with Village staff re.ardi•nfi i�• g <br />peg � would he directed rec teci away from McNe i 1 s and fro; a <br />reached • appears that drainage toward Ferndale* (If tl � i s is so, <br />high point there town rcl the lake and the rest t <br />we would a 1 n turally create a ponding area in and around the lower areas near Ferndale between McCaffrey and Ttovick properties . ) <br />vil' S gratification <br />1-Mitdiell to Seller statin; M� <br />290 July " 1?74 -Letter from <br />Since prid i <br />of oii-site ireeting. <br />McCa f f rey a <br />_ �teC;a f fret/ to "iitc1ie11 summarizing pronosed grading, e l a in to <br />9 .Nu st 26 1974 Letter from � X1? <br />Z �'u• this mid ke <br />r <br />_ McCaffrey to Mitchell explaining progress on grading. <br />3(l . C�ctol�er 9 , 1974 Letter from 1�4cCa y . <br />change - tinder retaining wall .) Mr. Benson <br />(Another 5 , 19 76. A <br />• permit issued McCaffrey. 11is acquiring application makes � Gary C'k3bric <br />31. h1av 5 , 1974 - Building permi 5(1 (��9' . <br />him the contractor - (cost estimate change to <br />New elevati <br />with permit application' shows structure location to be proposed g r <br />32 . slay S , 1g 74 Site plan i I� s However, as a solid 12 ' clerk <br />1 setback, is much less, s , of tit i s ag r <br />41 from lakeshore . (Actual record and no variance <br />has been added to structure with no revised plans on • <br />cord requesting change in approved setback variance a Now to add <br />appl scat loan on req Skarp , the <br />• theprogress on the Rovi ck property. This is the property 1 'mine a_� it <br />The following is a stmnary of <br />roh 1 an . �� � th rough h is <br />with which Mr. McCaffrey is now having a drainage }� <br />approval on <br />Mr. R,ovzck obtained variances from side yard, street and lakeshore setback require- to this al t <br />nrents from Council ogu <br />n August 27 1973 (lakeshore setback approval was SO') . complaining <br />and never s <br />ruct ion makes application icat ion for building permit for to the i npr <br />2. November 1�, 1975 - C�eprys Construction P • d n� out on previous <br />Rov is <br />k house. I informed contractor statute of 1 im" tat ions had p <br />• application i c at ion would have to be submitted. I suggested he change pro- I f we a i ip rc <br />variance. New <br />posed location to 75from la <br />keshore because of our concern with pollution of Lake requi red . <br />Minne tonka . lie then submitted an appl icat ion for variance on November 18, 1975. Uiat had Co <br />Gabriel, tl l <br />• e and street setback variances -Requires 75' made the ;ii <br />3 . Tie cesnbe r 1975 - Council approves side <br />1 akeshore setback-0 for am� � i,� <br />obtaining approval 4. December 19 7 S After groval of variance, contractor again made appl - <br />p• din plans also. I noticed the <br />.cation for building permit. This time he had grading p proposed fill as noted p ed the plans and imediately informed him another application <br />. <br />have to be submitted for filling ing and grading and projected drainage <br />would a . <br />• this was a good thing as AlcCaf Caffrey had previously <br />. (Schel let utforfieci me that R n neighbor would build.) <br />informed him of his concern of drainage problems when R <br />
The URL can be used to link to this page
Your browser does not support the video tag.