My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-12-2022 Council Packet
Orono
>
City Council
>
2022
>
09-12-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2022 12:53:06 PM
Creation date
9/19/2022 12:42:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
Created:
9/19/2022 12:53 PM
Modified:
9/19/2022 12:53 PM
Text:
CC Exhibit D LA22-000032
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 06/23/2021 <br />Date Application Considered as Complete: 07/26/2021 <br />60-Day Review Period Expires: 09/25/2021 <br /> <br /> <br />To: Chair McCutcheon and Planning Commission Members <br /> Adam Edwards, City Administrator <br /> <br />From: Laura Oakden, Community Development Director <br /> <br />Date: August 15, 2022 <br /> <br />Subject: LA22-000032, Petit Design- Barry Petit, 3349 Crystal Bay Rd, Variance, <br />Public Hearing <br /> <br /> <br />Background <br />The applicant proposes construction <br />of a 2nd floor cantilever addition (34 <br />sq ft) over the existing first floor <br />cantilever on the home which is <br />located within the 75’ lakeyard <br />setback. The proposed deck addition <br />of 22.3 sq.ft (creating a 79 sq ft deck) <br />at the front door which is within the <br />75 lake yard. This changes the nature <br />of the existing hardcover from <br />driveway/landscaping to structure on <br />a property exceeding 25% hardcover <br />which requires a variance. As part of <br />the remodel the applicant is also <br />proposing a 2nd floor bathroom <br />addition over the existing covered <br />main floor front porch which meets <br />the 75’ lakeyard setback. The <br />project is maintaining the existing <br />levels of hardcover of the property at <br />43.7%, changing from at-grade <br />improvements (driveway) to <br />structural improvements (new deck). The applicant has designed the addition to follow the <br />average lakeshore setback for the property. The lot is substandard with respect to lot area, lot <br />width and currently has hardcover and building encroachments within the 75’ lakeyard setback. <br />The property will meet the structural coverage requirements and the average lakeshore setback. <br />Application Summary: The applicant is requesting variances for hardcover and 75’ lakeshore <br />setback to allow for a home addition and a deck addition to the existing home. <br />Staff Recommendation: Planning Department Staff recommends approval for a home addition <br />and hardcover within the 75’ lakeyard, building in the 75’ lakeyard setback and overall <br />hardcover to exceed 25%.
The URL can be used to link to this page
Your browser does not support the video tag.