Laserfiche WebLink
AGENDA ITEM <br /> <br />1. Purpose. The purpose of this action item is to accept the quotes for the replacement of the <br />generator at Lift Station #14. <br /> <br />2. Background. The generator experienced an engine failure on July 19th, after trouble shooting the <br />problem it was determined it is cheaper to replace vs. repair. The repair estimate was $11,000 and would <br />be the 2nd repair since 2020. <br /> <br />3. Project Scope. This project will replace existing 30kW backup generator for lift station 14 which <br />services the sanitary sewer system in the Forest lake bridge area. <br /> <br />4. Cost. The City received two quotes for generators, the lowest quote from a qualified contractor for <br />Generators was from Modern Power Solutions for $18,485.00 <br /> <br />Total cost for the of the project is $ 18,485.00 <br /> <br />a. Generator <br />Contractor Total Quote <br />Modern Power Solution (Cummins Genset) $ 18,485 <br />All –Phase Electric (Cummins Genset) $ 19,700 <br /> <br />5. Funding. This project will be funded through the Sanitary Sewer Enterprise Fund. The Sewer Fund <br />balance is projected to be $ 3,000,000 at the end of 2022. <br /> <br />6. Staff Recommendation. I recommend that Council accept the quotes from Modern Power and <br />Holton Electric. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to accept the quote in the amount of $18,485 from Modern Power installation of a <br />replacement backup generator at Lift Station #14. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Prepared By: SO Reviewed By: DJG Approved By: <br /> <br />Item No.: 7 Date: August 8th, 2022 <br />Item Description: Back Up Generator Replacement for Lift Station #14 <br />(Orchard Beach) <br />Presenter: Scott Oberaigner <br />Public Works Supervisor <br />Agenda <br />Section: <br />Consent Agenda <br />