Laserfiche WebLink
<br /> <br /> <br />Appendix E <br />Pop-up Responses <br />• Complaint that the scope of this project was not large enough. <br />• Clear corner to get more spaces out of the corner and retaining wall (Two green dots). <br />• Trees: shade and cooling will be essential with global warming. <br />• Move bollards at park to create more parking. <br />• Fix grading- In winter the slope gets icy & can’t use (Two green dots). <br />• Solar power shade structure. <br />• Confirming aisles & spaces. <br />• Rows are tight, backing up is tricky. <br />• Beautification – Pavers look nice but cost/maintenance (Two green dots). <br />• Directional and angle. <br />• Create a destination as the downtown. <br />• Gets used as a shuttle lot. <br />• Support the businesses – they need the parking. <br />• Bike parking/connection to Luce Line State Trail. <br />• Trailer and long vehicle parking. <br />• “Conduct for future improvements”. <br />• Work with landlord and center to screen dumpsters and [illegible] for their parking lot. <br />• Trash from businesses. <br />• Add a bike lane to set them from the trail connection to the crosswalk on 15. <br />• School bus drop off. <br />• Lyric Ave traffic calming. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />