My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-13-2022 Council Packet
Orono
>
City Council
>
2022
>
06-13-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/7/2022 11:18:05 AM
Creation date
9/7/2022 11:15:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />1795 St. Clair Avenue <br />St. Paul, MN 55105 <br />(651) 696-5186 <br />www.oertelarchitects.com <br /> <br /> <br /> The plumbing and electrical related work is of a minor scale, including 2 or 3 new sinks and potentially adding <br />some outlets at various locations. As a result, we are proposing that work be design-build by the contractor. <br />We would provide locations for the sinks and specify the sink/fixture types, the licensed contractor would be <br />responsible for providing the appropriate piping and connections to / from the new sinks to the existing <br />services in the basement. Similarly we would provide locations and types of electrical outlets and light fixtures <br />as required, and the licensed electrical contractor would provide appropriate connections to the existing <br />electrical panels in the basement. This is in an effort to reduce unnecessary engineering fees be added to the <br />proposal. If the City desires we can provide those engineering services for an additional fee. <br /> <br /> <br />PROPOSED SERVICES <br /> <br />Schematic Design: (15% of Total Fee) <br /> <br />Deliverables: <br />• Existing plan <br />• Proposed preliminary plan options (up to 3) <br /> <br />Design Development: (40% of Total Fee) <br /> <br />Deliverables: <br />• Developed floor, ceiling, and demolition plans <br />• Locations and layout of appliances <br />• Locations and layout of sinks <br />• Locations of new outlets and light fixtures <br />• Catalog cuts of all proposed equipment <br />• Outline Specifications <br />• Materials and color schedules for proposed finishes <br /> <br />Construction Documents: (30% of Total Fee) <br /> <br />Deliverables: <br />• Final floor, ceiling, and demolition plans <br />• Final specifications <br /> <br />Bidding/Contract Administration (15% of Total Fee) <br /> <br />Bidding Services: <br />• Provide construction documents to selected contractors <br />• Review of contractor questions and prior approvals <br />• Preparation of architectural addenda <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.