My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 3. ABSORPTION AREA SIZING <br /> Note:Mound setbacks ore measured from the Absorption Area. <br /> A. Calculate Absorption Width:Bed Width (2.6)X Mound Absorption Ratio (1.F)=Absorption Width <br /> 10.0 ft x 2.6 = 26.0 ft <br /> B. For slopes>1%,the Absorption Width is measured downhill from the upslope edge of the Bed. <br /> Catculate Downslope Absorption Width:Absorption Width (3.A)-Bed Width (2.6)=ft <br /> 26.0 ft - 10.0 ft = 16.0 ft <br /> 4. MOUND SIZING <br /> A. Calculate C(ean Sand Lift: 3 feet minus Depth to Limitinq Condition (1.C)=Cleon Sand Lift (1 ft minimum) <br /> 3.0 ft - 1.5 ft = 1.5 ft Design Sand Lift(optional): �1.5 <br /> B. Calculate Upslope Height:C(ean Sand Lift (4.A)+media depth (t ft.)+cover (1 ft.)=Upstope Heiqht <br /> 1.5 ft + 1,0 ft + 1.0 ft= 3.5 ft <br /> D-?-,:�lo[e'.tuitiplier Tahir <br /> � Ld(1dSI0pt+;5 0 I 2 3 4 5 6 1 8 9 iQ II 11� 13 id IS 16 f7 '8 14 20 21 22 13 Z4 1� i <br /> I Up�19R? I's:1 ?.00 2.51�i.3i 1.15 2.5$ 2.Si 2.Ss�2.�49 Lai �.35��.31i2.2� 2.;I�T.'? i.�?ji.CS i.05 ?.u; ?.00� 1.9? 1.9> I."r� l.i� i.89 1.8' L?i! <br /> j E��7n hd;'n jd:i �.�J i.85 i.i0 3.57 3.d5 J.33�3.23 3J2 ?.D3 2.9a�?.8b 2.78 2.70 2.b2 2.55 2.�8 ?.at 2.35 214 ?.23 2.18 2.13 2.08 1.Di 198 1.9�j <br /> I LandSlope`b 0 1 3 a 5 h 7 9 9 10 il 11 ' !7 i3 I5 I4 �1 IB 19 10 21 2t 13 24 25 i <br /> � DO';;I151rp? �`1:1 3.1N :.C'>�3.'i 3.i^ i.al 3.53�i.Eb�i.F.t ?55 4.0 419�:.1�3 �.SS�'�5�i,'tJ i.i5 5.89 6.2�! �.63 7.0: 7..1.'• ?.=>i 9.�1:�3.9's 9.�t6 it�.U�� <br /> �� E�Ifii R�i�i; i4:1 ;.DO �.17 J.35 J.�l d.76 9.� 5.I6 5.55 5.B6 b,i5 5.b1 ?,ta 7.65 E."t5 8.92 951 10.2a 10.4J it.67 12.J2 13.14 '3.59 W.8't �5,67 ?6.5� 17..�:� <br /> � Select Upslope Berm Mu(tip(ier <br /> (based on land slope): 2.70 (figure D-34) <br /> D. Calculate Ups(ope Berm Width:Multip(ier (4.C)X Ups(ope Mound Height (4.B)=Ups(ope Berm Width <br /> 2.70 ft X 3.5 ft = 10.0 ft <br /> E. Calculate Drop in Elevation Under Bed:Bed Width (2.B) X Land S(ope (1.D):100=Drop (ft) <br /> 10.0 ft x 12.0 % : i oo= 1.20 ft <br /> F. Calcutate Downstope Mound Height:Upslope Height (4.6)+Drop in Elevation (4.E)=Downslope Height <br /> 3.5 ft + 1.20 ft = 4.7 ft <br /> G Select Downs(ope Berm Multip(ier <br /> (based on land stope): 5.32 (figure D-34) <br /> H. Calculate Downslope Berm Width:Mu(tip(ier (4.G)X Downslope Height (4.F)=Downslope Berm Width <br /> 5.32 x 4.7 ft = 25.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area:Downs(ope Absorption Width (3.6 or 3.C)+4 ft. =ft <br /> 16.0 ft + �� ft = 20.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 25.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usualty 3.0 or 4.0) <br /> L. Calcutate Ends(ope Berm (4.K)X Downs(ope Mound Height (4.F)=Ends(ope Berm Width <br /> 3.00 ft X 4.7 ft = 15.0 ft <br /> M.Calculate Mound Width: Upslope Berm Width(4.D)+Bed Width (2.6)+Downs(ope Berm Width (4.J)=ft <br /> 10.0 ft + 10.0 ft + 25.0 ft = 45.0 ft <br /> N. Catculate Mound Length:Endslope Berm Width (4.L)+Bed Lenqth (2.C)+Endslope Berm Width (4.L)=ft <br /> 15.0 ft + 63.0 ft + 15.0 ft = 93.0 ft <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.