My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � OSTP Mound Design Worksheet <br /> Minnesota Pollution p <br /> UNIVERSITY <br /> Controi Agency >1 / Stope OF MINNESOTA �""'?',��;`�., <br /> �• SYSTEM SIZING: ProjeCt ID: v 11.09.22 <br /> A. Design F(ow(Flow&Soi(- 1.A): 750 GPD TABLE IXa <br /> B. Soil Loading Rate(Flow&Soi(-3.C): 0.45 GPD/ftZ LOADING RATES FOR DETERMINING BOTTOM ABSORPTION AREA <br /> AND ABSORPTION RATIOS USING PERGOLATION TESTS <br /> C. Depth to Limiting Condition: 1.5 ft Treatment Leve1 c Treatment Lcvel A,A•2,B, <br /> D. Percent Land S(ope: 12.0 % � Perco�ation Rate Absorptioo ���d nbso�onoo ��� <br /> Area Loading Area Loading <br /> ���� Ra[e Absorption Rate �SOfP�O� <br /> E. Design Media Loading Rate: 1.2 GPD/ftZ ' � <br /> (��RZ) Ratio ���ft� Ratio <br /> F. Mound Absorption Ratio(Tabte IXa): 2.60 I<o� . � _ � <br /> G.Design Contour Loading Rate: 12.0 GPD/ft o'`O 5 1.2 > >.s i <br /> �-0.�to 5(fine sand 0.6 2 1 1.6 <br /> Tabie 1 and ioamv I�ne sarxl <br /> 1AOUND CONTOUR LOADING R.1TE5; e t��� 0.78 �.5 � 1.6 <br /> s.oawrad ' Texturp-darivad <br /> �Cntaur ?o"to 30 0.6 2 0.78 2 <br /> Rprc Rais oR mound abso�pdon rat,o Loading .3;ro� <br /> . Fat4: 0.$ 2.4 0.78 2 <br /> �'���� 0.45 2.6 0.6 2.6 <br /> :b0�:i,'.. L0. i.i.2Q.'[.-1.L6 c 12 <br /> ,6�totZp _ 5 0.3 5.3 <br /> 51-12C mpi �R S.Q cti '>t?0 - ' ' ' <br /> = �=�'�"�" �`-'-� -h' 'Systems with these values are not Type I systems. Contour Loading Rate(linear <br /> loading rate)is a recommended value. <br /> 2. DISPERSAL MEDIA SIZING <br /> A. Catculate Required Dispersal Bed Areo:Design F(ow (1.A):Design Media Loading Rate (1.E)=ftZ <br /> If a larger dispersal media area 750 GPD: 1.20 GPD/ftZ = 625 ftZ <br /> is desired,enter size: ��ftz <br /> B. Calculate Dispersal Bed Width:Contour Loading Rate (1.G):Design Media Loading Rate (1.E)=Bed Width <br /> 12.0 ft : 1.2 gpd/ftz = 10 ft <br /> C. Calculate Dispersal Bed Length: Dispersal Bed Areo (2.A)=Bed Width (2.6)=Bed Length <br /> 625 ftz : 10 ft = 63 ft <br /> D. Select Dispersol Media: <br /> E. If using a registered product,enter the Component Length: ��in: 12 = �ft <br /> F. If using a registered product,enter the Component Width: �in: 12 = Qft <br /> G. Number of Components per Row =Bed Length (2.C)divided by Component Length (4.J) (Round up) <br /> � ft : � ft= �components/row <br /> H, Number of Rows =Bed Width (2.6)divided by Component Width (4.K) (Round up) Note:CLR of 10.3 <br /> ga(/ft results in 9 foot <br /> Adjust Contour Loading Rate on Design Summary page until this number is a whole number wide bed. <br /> � ft: � ft= �� rows <br /> I, Toto(Number of Components =Number of Components per Row X Number of Rows <br /> � X � - ��components <br />
The URL can be used to link to this page
Your browser does not support the video tag.