My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY <br /> . � <br /> Min�esota Pollution Des�gn Worksheet OF MINNESOTA <br /> Control A enc �-''-�'" <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Loterals in system/zone: � --_ _ -- <br /> �„...�.,., �,,:.:,.�:�, <br /> (2 feet is minimum and 3 feet is maximum spacing) <br /> _ .:. _ ��. , <br /> 2. Select Perforation Spacing: 3.0 ft � ' s�'' � _ _ <br /> < . � <br /> Min�muin <br /> '/-'�����I�.�:�t������.�.��.���.cl�t'.��i.��i 1"�2"ol r�>ck •r „ .a <br /> 3. Setect Perforation Diameter Size 7/32 in _ _ <br /> C."c�l rwk <br /> 4. Length of Laterals =Media Bed Length-2 Feet. �.������.,�;�,,, �»:' "io n" rc�toc,ron;�.,nn�� �'co, <br /> 63 - 2ft = 61 ft Perforation can not be closer then 1 joot from edge. <br /> 5• Determine the Number of Perforation Spaces. Divide the Length of Latera(s (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- �ft = 20 Spaces <br /> 6. Number of Perforations per Loteral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Latern( = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check toble below to verify the number of perforations per(ateral guarantees(ess than a 10%discharye voriotion. The va(ue is <br /> double if the a center manifold is used. <br /> Maximum Nurt�er of Fe��ations Fer L�eral to Guarantee<:tfl�e i�ischarge Variaro� <br /> `,(nth P QfeiG�15 7t32 Inc�Pe�feratio�s <br /> Pipe Diarrr�ier llnches) Perfaratiun Spacing Pip?Uameter(Inchesi <br /> Fe�farat:on Spaong iFeet? <br /> t il; i�: 1 3 IFe�etl 1 1�: 11: 1 3 <br /> 2 tt� 13 i� 30 60 2 11 16 2! 34 68 <br /> 2;". 8 12 t5 28 54 2�: 1Q 1�1 2C� 32 h4 <br /> 3 $ 12 ib 25 5't 3 9 14 19 30 6Q <br /> 3'16 lrt�h Perforatians 1'8 lnch Pe�fcrations <br /> F'ipe Diar►�ter tincEws) Perfaration Sp�cing Fipe tha!*�eter(inch�sl <br /> Pe�crai�o:�Spacn�(Feetl <br /> t 11: 1 t� 2 3 (Feetl i t� f tZ 2 3 <br /> 2 12 18 2b 46 87 2 2t 33 44 14 149 <br /> 2�� 12 17 1� 44 8n 2i: 24 3Q 4t b9 135 <br /> 3 12 16 12 37 75 � 2C 19 38 b4 12� <br /> 7- Total Number of PerJorations equals the Number of Perforations per Latera( (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X �Number of Perf. Laterals = 63 Total Number of Perf. <br /> ___ _ __ _ <br /> 8. Catculate the Squore Feet per Perforation. Recommended value is 4-10 ftz per perforotion. °e`«•"°"°„`""�"`P"`� <br /> Does not app/y to At-Grades Hcad(tt) �rforatbn Dtamecer <br /> ,,a �,, , �,, <br /> Bed Area = Bed Width(ft)X Bed Length (ft) <br /> �,O' 0.18 O.it 0.56 0.71 <br /> 7.5 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ftZ =.°° °.� °.5' °.� ,.°` <br /> 2.5 0.29 0.65 D.89 1.17 <br /> 3.0 0.72 0.72 0.98 1.26 <br /> Square Foot per Perforation =Bed Area divided by the Tota!Number of Perforations (Line 7). 4.0 0.» 0.83 ,.,3 ,.°7 <br /> s.o` o.ai o.93 �.ze i.es <br /> � Z � Llvellir�with 31 t6 irKh[o t l�irch <br /> 630 ft 63 perforations = 10.0 ftZ/perforations '`�°` OCAO�a(i0M <br /> C�vrlling:wi[h 1/e inch peAora[cfc <br /> Zleet Otherr,[aMishmen[sand,vS75wich3/16 <br /> 9. Select Minimum Average Head: 1.� ft inch to 7/a inch DeRoratbn <br /> 5 Ittc a�e�`zcadisnments and Y575 wi;n t/B irxh <br /> perforations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11• Determine required Flow Rate by multiplying the Toto(Number of Perforations (Line 7)by the Perforotion Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.