My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
200 Bayside Trail - 06-117-23-22-0027
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:11 PM
Creation date
9/10/2015 1:20:58 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Bayside
Street Type
Trail
Address
200 Bayside Tr
Document Type
Septic
PIN
0611723220027
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materiats Worksheet UNIVERSITY <br /> Minnesota Poliution �� -'��' <br /> OF MINNESOTA ,,�-,,_ <br /> Control Agency <br /> Projed ID: v 11.09.22 <br /> A• Calculate Bed (rock)Volume:8ed Length (2.0 X Bed Width 2.6)X Depth =Vo(ume ft' <br /> 63.0 ft X 10.0 ft X i.o = 630.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic ards: <br /> 630.0 ft' : z7 = 23.3 yd' <br /> Add 20%for constructability: 23.3 yd'X 1.Z = 28.0 yd' <br /> B. Calculate Ctean Sand Volume: <br /> Votume Under Rock bed:Average Sand Depth x Media Widfh x Media Length =cubic feet <br /> 2.3 ft X 10.0 ft X 63.0 ft = 1428.0 ft3 <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> f[ -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Tota!Clean Sand Volume: Volume from Length+Vo(ume from Width+Volume Under Media <br /> ft' + � ft' + ft' = ft' <br /> For a Mound on a slope greater than t% <br /> Upslope Vo(ume:((Upslope Mound Height - 1)x 3 x Bed Length)+2=cubic feet <br /> (( 3.7 ft -1) X 3.0 ft x 63.0 )t z= 252.0 ftj <br /> Downslope Volume:((Downslope Height- f) x Downslope Absorption Width x Medio Length)�2=cubic feet <br /> (( 4.9 ft-�) x 16.0 ft X 63.0 )�2= 1948.8 ft' <br /> Endslope Volume:(Downslope Mound Height- 1)x 3 x Media Width =cubic feet <br /> ( 4.9 ft-1 ) X 3.0 ft X 10.0 ft = 116.0 ft' <br /> Total Cleon Sand Volume:Upslope Volume +Downslope Volume +Endslope Valume +Volume Under Media <br /> 252.0 ft' + 1948.8 ft' + 116.0 ft' � 1428.0 ft'= 3744.8 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 3744.8 ft3 = z7 = 138.7 yd3 <br /> Add 20%for constructability: 138.7 yd'X 1.2 = 166.4 yd' <br /> C. Calculate Sandy Berm Volume: <br /> Tota!Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)y 2=cubic feet <br /> ( 4.3 . 0.5 )ft x 45.0 ft X 93.0 )�z= 7881.8 ft' <br /> Total Mound Vo(ume-Clean Sand volume-Rock Volume=cubic feet <br /> 7881.8 ft' - 3744.8 ft' - 630.0 ft' = 3507.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 3507,0 ft' : 27 = 129.9 yd' <br /> Add 20%for construc[ability: 129.9 yd' x 1-2 = 155.9 yd' <br /> D. Calculate Topsoi!Moterial Volume:Tota!Mound Width X Tota(Mound Length X.5 ft <br /> 45.0 ft x 93.0 ft x o.5 ft = 2092.5 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2092.5 ft3 : 27 = 77.5 yd3 <br /> Add 20%for constructabitity: 77.5 yd; x �.z = 93.0 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.