My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
185 Bayside Trail - 06-117-23-22-0028
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:14 PM
Creation date
9/10/2015 12:21:56 PM
Metadata
Fields
Template:
x Address Old
House Number
185
Street Name
Bayside
Street Type
Trail
Address
185 Bayside Tr
Document Type
Septic
PIN
0611723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> Minnesota Pollution UNIVERSITY _� - <br /> Design Worksheet OF IVIINNESOTA <br /> Control A enc - �``�;' <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Lotero(s in system/zone: � _--- ---- <br /> (2 feet is minimum ond 3 feet is maximum spacing) " �����" "� �'" _ _ <br /> _;, _ ,_ <br /> 2. Select Perforation Spacing: 3.0 ft ` � � 1z�'�' _ � <br /> � � <br /> M�����n�m <br /> 'Ja'f��•rio�:ation•..��:���•d 3'.���.�r� t`7.•of�ock 11" <br /> 3. Select Perforation Diameter Size 7/32 in _ _ <br /> G"uf�u�k <br /> 4. Length of Loterols =Media Bed Length -2 Feet. P<,f�,�.,,,�„s ,,, ,-,� P�„��,..,�,��,,U.,�„�,� ,, <br /> 63 - 2ft = 61 ft Perforation can not be c(oser then 1 Joot from edge. <br /> 5• Determine the Number of Perforation Spaces. Divide the Length of Laterols (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- �ft = 20 Spaces <br /> 6. Number of Perforotions per Loteral is equai to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check tab(e below to verify the number of perforotions per fatera(guarantees less than a 10%discharge variation. The value is <br /> doubte if the a center manifold is used. <br /> Maximu�N�rt�er of Perfaations P�Lateral to Guarante�e�1U+ti Discharge Variaiion <br /> �i�,n P�tc�ra�a�s 1;311nch P?rforatians <br /> Pipe Qiameter(Irxhesl Fe�foratio�Sp3cing Pipo Cra�reter(lr�thes} <br /> Pe�foratinn Spacng IFr_�tl <br /> t 1S•: 11� r 3 (Feefi f lYs 1�� 2 3 <br /> i 10 13 18 30 60 2 11 16 21 34 6$ <br /> Z�^. � t2 16 28 54 2�: 1G 14 20 32 b� <br /> 3 8 i2 1b 25 52 3 9 14 19 30 64 <br /> 3i16 knch Perfora:ions 1 '8 Inch Petforattons <br /> Pipe Qiameter Ii�chesl Pe*foration Spacing Pipe DsameiEr(Inches! <br /> Pe�forat ry�SRac�ng IFeetl <br /> 1 1�� 1ti: I 3 (Feetl I 1�. 11: 2 ? <br /> Z 12 18 26 4b 87 2 21 33 �4 74 149 <br /> 2�2 12 17 24 44 80 1�`: 20 30 �tt 69 135 <br /> 3 12 15 2Z 37 75 3 20 29 38 54 128 <br /> 7• Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perjorated Laterals (Line 1). <br /> 21 Perf. Per Lateral X �Number of Perf. Laterals = 63 Totat Number of Perf. <br /> ___ <br /> 8. Calculate the Square Feet per Perforation. Recommended velue is 4-10 Jt Z per perforation. P�``°""°"°iscAa�jG°"> <br /> Perforatlon Dlamctcr <br /> Does not apply to At-Grades Head Itq , a ,� -�_ ,� <br /> i <br /> Bed Area = Bed Width (ft)X Bed Length(ft) ,.o• � o.�e o.., 0.56 0.�. <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ft2 2°° °.�` °59 °�° ,.°' <br /> 2.5 0.29 0.65 0.H9 1.17 <br /> 3.0 0.32 0.72 0.98 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Tota!Number of Perforations (Line 7). _.� �37 �8= , +_ +•� <br /> SA` p.qi 0.91 1.26 t-65 <br /> Z pweliings vn[h 3/Ib iM�t0 1/4 irKh <br /> 630 ft = 63 perforations = 10.0 ft2/perforations '`°°` o���d�w�� <br /> DweUing,vrich t/8 irx�pertora[iom <br /> 2�ee[ Oct�er es[aCti;hmenl5 and M5T5 wi[h 31t6 <br /> 9. Select Minimum Average Head: 1.0 ft inch to tia inch peAoraciof¢ <br /> 5 feec a�r cZtaDli:llmenl5 dnG M5T5 wl[h 1/9 inch <br /> pMoratartt <br /> 10. Select Perforation Discharge (GPM)based on Table I11: 0.56 GPM per Perforation <br /> 11• Determine required Flow Rate by multiplying the Toto(Number of Perforations (Line 7)by the Perforotion Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.