My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
185 Bayside Trail - 06-117-23-22-0028
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:14 PM
Creation date
9/10/2015 12:21:56 PM
Metadata
Fields
Template:
x Address Old
House Number
185
Street Name
Bayside
Street Type
Trail
Address
185 Bayside Tr
Document Type
Septic
PIN
0611723220028
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materiats Worksheet UNtVERSITY ` <br /> Minnesota Pollution OF MI NNESOTA �,���� <br /> Control Agency - <br /> ProjectlD: v 11.09.22 <br /> A. Calculate Bed (rock)Volume:Bed Length (2.0 X Bed Width (2.6)X Depth =Volume ft' <br /> 63.0 ft X 10.0 ft x �.o = 630.0 ft' <br /> Divide ft'by 27 ft'/yd�to calculate cubic ards: <br /> 630.0 ft' : z7 = 23.3 yd' <br /> Add 20%for constructability: 23.3 yd'X 1.2 = 28.0 yd' <br /> B. Calculate Clean Sand Vo(ume: <br /> Volume Under Rock bed:Average Sand Depth x Medio Width x Media Lenqth =cubic feet <br /> 2.1 ft X 10.0 ft x 63.0 ft = 1333,5 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Total Clean Sand Vo(ume: Volume jrom Length+Vo(ume from Width+Volume Under Media <br /> ft' + ft' + ft3 = ft' <br /> For a Mound on a slope greater than t% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)*2=cubic feet <br /> (( 3.7 ft -t) x 3.o ft X 63.0 )�z= 252.0 ft' <br /> Downslope Volume:((Downslope Heiqht- 1) x Downslope Absorption Width x Media Length)�2=cubic feet <br /> (( 4.6 ft-�) X 16.0 ft X 63.0 )�z= 1797.6 ft' <br /> Endslope Volume:(Downs(ope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.6 ft-1 ) X 3.0 ft X 10.0 ft = 107.0 ft' <br /> Totol Clean Sand Volume:Upslope Volume +Downslope Vo(ume +Endslope Volume +Volume Under Media <br /> 252.0 ft' + 1797.6 ft' + 107.0 ft' + 1333.5 ft'= 3490.1 ft' <br /> Divide ft'by 27 ft'/yd3 to calculate cubic yards: 3490.1 �t3 : z7 = 129.3 yd; <br /> Add 20%for constructability: 129.3 yd'X 1-2 = 155.1 yd3 <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)+2=cubic feet <br /> � 4.1 _ 0.5 �ft x 47.0 ft x 91.0 )�z= 7734.2 ft' <br /> Totol Mound Volume-C(ean Sond volume-Rock Volume=cubic jeet <br /> 7734.2 ft' - 3490.1 ft' - 630.0 ft' = 3614.1 ft' <br /> Divide ft'by 27 ft'/yd'to catculate cubic yards: 3614.1 ft' = 27 = 133.9 yd' <br /> Add 20%for constructability: 133.9 yd' x 1.2 = 160.6 yd' <br /> D. Catculate Topsoil Materia!Volume:Total Mound Width X Tota1 Mound Length X.5 ft <br /> 47.0 ft x 91.0 ft x 0.5 ft = 2138.�ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2138.5 ft' = 27 = 79•2 yd3 <br /> Add 20%for constructability: 79.2 yd' x �•2 = 95.0 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.