My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design (2)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
9/10/2015 11:35:29 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ OSTP Pressure Distribution r�- ��,� <br /> UNIVERSITY �-� i� <br /> Minnesota Poilution Design Worksheet OF MINNESOTA "LL�' ��"�� <br /> Cor�troi A enc ._�.�.�.�,L��.,� <br /> 1 <br /> ProjectiD: ���.09 22 <br /> 1. Select Number of Perforated Laterals in system/zone: � _ ---- <br /> (2 feet is minimum and 3 feet is maximum spncing) """'"`""<""��A <br /> � � � __r f <br /> 2. Select Perforotion Spacin3� 3.0 ft "`\ , _" . ,�'S °<���, �~ - <br /> < ..,.�,�.. <br /> Min'mum <br /> �� 'r.'piyforatio��s a�acea 3'apon _ i'�2'of rock l2' <br /> 3. Select Perjoration Diameter Size 7/32 in _ <br /> -G"ui rocfc � <br /> 4. Length of LnterQls =Media Bed Length-2 Feet. ��fa<<,��o���+��:��.-«'/•' Perfora2bn swcing:2'to 3' <br /> 63 - 2tt = 61 ft Perforation can not be closer then 1 foot from edge. <br /> 5• Determine the Number of Perforation Spaces. Divide the Cength of Lnterais (Line 4)by the Perforation Spacing {Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft - �ft = 20 Spaces <br /> 6. Number of Perforations per Laterai is equat to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Latera( = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforotions per loteral guarantees less thon a 10%discharge variation. The va(ue is <br /> double if the a center manifo(d�s used. <br /> 7�4aximum NumbEr o#Pes#oratio�s P�s laierat to Guarantee<t�D�scharge Yan�tion <br /> i,inc P arations 7/32 Inc�Per#oraCions <br /> Perforat:on Spa�i�g iFeet) �P��ame#er dlnchesi Per{oration Spaci� Pipe Qiarr►eter(Inches) <br /> t 1 K 11� 2 3 1Feet 1 1 11� t E§ � 3 <br /> � 10 i3 i8 3Q 60 2 ti ib 2i 3� b$ <br /> Zi:' 8 12 1 b 28 54 2µ 1 Q 14 20 31 6� <br /> 3 8 i2 fb 25 52 3 4 94 t9 30 6Q <br /> 3r'i b l�t+Perfora#iais 9:'8 lrxt�Perferat�ns <br /> Pipe I?iameier�Inchesl Pe;iaratio:�Spacing Pipe D'sameter(Inches) <br /> Pe�atatio�Sp�ng IFeetj <br /> t i� 1�; ? 3 1Fe�t1 1 i� 1Yt 2 3 <br /> 2 12 i8 2b 4�. 87 2 2t 33 �F4 r4 t+#9 <br /> 2ll 12 17 24 40 80 2�C 20 3{? �! 69 #3� <br /> � 12 !b 2� 37 ?5 3 34 29 38 b# 128' <br /> �• Totat Number of Perforotions equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforoted Leterals (Line 1). <br /> 21 Perf. Per Lateral X �Number of Perf. Laterals = 63 Totat Number of Perf. <br /> 8. Calculate the Square Feet per Perjoration. Recommended value is 4-10 ftZ per perjoration. T PeTiO�"onD#���6PM� <br /> Does not apply to At-Grades PeHonHon Dlametrr <br /> �e.d u�� <br /> ��a ��� v�i ��+ <br /> Bed Area = Bed Width(ft)X Bed Length (ft) �,� o.is o.s� o.sb o.�s <br /> 1.5 0.22 0.51 O.b9 0.9 <br /> 10 ft x 63 ft = 630 ft2 Z� 0.26 0.59 0.� ,.o, <br /> �5 0.�9 o.ds o.� ,.,� <br /> 3.0 0.32 0.72 0.98 1.78 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). <.o 0.3� o.� ,.,� ,..� <br /> SA` O.N 0.93 t.26 L65 <br /> 2 Oweili�s vnth 3/16 inch co 1/�inch <br /> 630 ft - 63 perforations = 10.0 ftZ/perforations "°°` p�oratfom <br /> Dwelltn�gs with t/8 inch peAoratiorts <br /> 3 feec pther establhhmenu and VSfS vAth 3/76 <br /> 9. Select Minimum Average Head: 1.0 ft incfi to t/a i�h peAora[iom <br /> � 5 f�� Ochcr ataWi,hmmtz and N5T5 with t/8�nch <br /> pcAoratiom <br /> 10. Select Perforation Discharge (GPM)based on Table ili: 0.56 GPM per Perforation <br /> ��• Determine required F(ow Rate by multiplying the Tota!Number of Perforations (Line 7)by the Perforofion Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.