My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design (2)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
9/10/2015 11:35:29 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� OSTP Mound Materials Worksheet UKIVERSITY '� ..�� <br /> Mi�nesata Pollution <br /> OF MINNESOTA � �"'' <br /> Cor�trol Agency ___-,--v���. <br /> ProjectlD: v 11.09.22 <br /> A.Calcutate Bed(rock)Volume:8ed Lengih (2.0 X Bed�dth 2.6)X DepYh=Volume ft3 <br /> 63.0 ft X 10.0 ft x �.o = 630.0 ft' <br /> Divide ft;by 27 ft'/yd'to catculate cubic ards: <br /> 630.0 f� : 27 = 23.3 yd3 <br /> Add 20%for constructabitity: 23.3 yd'X 1.2 = 28.0 yd3 <br /> 8. Calculate Clean Sand Vo(ume: <br /> Vo(ume Under Rock bed:Averoge Smid Depth x Media Width x Medio Length =cubic feet <br /> 2.4 ft X 10.0 ft X 63.0 ft = 1480.5 tt� <br /> For a Mound on a slope from 0-1% <br /> Volume from Length={(Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1j X X ft = <br /> Total Ciean Sand Vo[ume:Volume f�om Lenqth+Volume from Width+Volume Under Media <br /> . � +' �l + 7[ = L��ft3 <br /> L.___ <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope hbund Height -1)x 3 x Bed Length)�2=cubic feet <br /> (( 4.0 ft -1) X 3.o ft X 63.0 )�2= 283.5 ft� <br /> Downslope Vo(ume:((Downslope Height-1)x Domulope Absorption Width x Media Length)+2=cubic feet <br /> (( 4.7 ft-1) X 16.0 ft X 63.0 )=2= 1864.8 ft' <br /> Ends(ope Vo(ume:(Oownslope Mound Height-1) x 3 x Media Width =cubic feet <br /> ( 4.7 ft-1 ) X 3.0 ft X 10.0 ft = 111.0 ft' <br /> Totat C(ean Sand Volume:Upslope Vo(ume +Downs(ope Volume +Endslope Volume +Votume Under Media <br /> 283.5 ft3 + 1864.8 ft' + 111.0 ft3 + 1480.5 ft3= 3739.8 ft' <br /> Divide ft3 by 27 ft'lyd'to calculate cubic yards: 3739.8 ft' : 27 = 138.5 yd3 <br /> Add 20%for constructability: 138.5 yd X 1_2 = 166.2 <br /> yds <br /> C.Calcutate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mou�Height-0.5 ft topsoil)z Mound Width x Mound Length)-�2=cubic feet <br /> { 4.4 _ 0.5 )ft X 47.9 ft X 91.2 )+2= 8413.5 ft3 <br /> Tota(Mound Volume-Ciean Sand volume-Rock Vo(ume=cubic feet <br /> 8413.5 ft' - 3739.8 ft' - 630.0 ft' = 4043.7 ft' <br /> Divide ft'by 27 ft'/yd3 to calcutate cubic yards: 4043.7 ft' � 27 = i 49.8 yd' <br /> Add 20%for corutructability: 149.8 yd3 x �.2 = 179,7 yd3 <br /> D.Catculate Topsoil Moterio(Voiume:Totn(Mound�dth X Totn(Mound Length X.5 ft <br /> 47.9 ft X 91.2 ft x o.5 ft = 2185.3 ft' <br /> Divide ft3 by 27 ft3lyd'to calcutate cubic yards: 2185.3 ft' = 27 = gp,g yd3 <br /> Add 20%for constnxtabitity: 80.9 yd3 x 1 Z = 97.1 yd3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.