My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design (2)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
9/10/2015 11:35:29 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution . <br /> -�'� UNIVERSITY '"`� '� <br /> Minnesota Poliution Design Worksheet OF N�INNESOTA ._,.:�''^ +`'��„ <br /> Control A enc ``'��� <br /> Project ID: v 11.09.22 <br /> 1. Selett Number of Perforated Latera(s in system/zone: � ,_------- _ <br /> i.�ww�c<a..�c<.s eo. <br /> (Z feet is minimum and 3 feet is maximum spacing) , __ _ _ _ __ _ _ <br /> ., �,_-� _ <br /> 2. Select Perforation Spacing: ��ft „-" , �. 1z 5p° � _ - <br /> � a.,,�.. <br /> Mrn�mVin <br /> '!�"prrtora�ions sp:�ced 3'ap�rt t"�2'of rnck 12` <br /> 3. Select Perforation Dinmeter Size �in _ _ <br /> 6-oi rock <br /> 4. Length of Laterals =Media Bed Length-2 Feet. P"''°`a"�"s'�`"g:•,`-_°'`.� Pe''"`�"�"��`'"°:2�`a 3• <br /> � - 2ft = �ft Perforation con not be ctoser then 1 foot from edge. <br /> 5• Determine the Number of Perforotion Spnces. Divide the Length of laterats (Line 4)by the Perforntion Spacing {Li�e 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = �ft .- �ft = ��Spaces <br /> 6. Number of Perforntions per Latera! is equal to i.0 ptus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lnternl = �Spaces + 1 = �Perfs. Per Lateral <br /> Check table below to verify the number of perforations per laterat gunrantees less than a 10%discharge variotfon. The value is <br /> double if the a center manifold is used. <br /> Maximum tiumber of P+�rforatioru P�r Lateral to Guarant2e�10§6 Discharge Yariatian <br /> :';In�:h P . a-arans 7/32 Inch Ferforations <br /> Pipe Qiamete��inches� P2rforation Spacing Pipe Uiameter{Inthesl <br /> Ferfsoratron Spac'sng[Feet) <br /> i tY� i1; 2 3 (��1 1 11� t?': 2 3 <br /> Z 14 13 18 30 b0 2 11 1b 21 34 6S <br /> Zts 8 12 15 28 54 2�h 10 14 2Q 32 6�4 <br /> 3 8 !2 4b 25 52 3 9 9A 19 34 64 <br /> 3ji6lnch Pertorations iB inch Ptxforatsans <br /> P'►pf Diam�ter tis�chpsl Ferforation Sp.acing Pipe fliarr►eter(inthes) <br /> ge�E4satu.�n S�acin�{feetl <br /> 1 !� 1� 2 3 (Feet) 1 t� ir: 2 3 <br /> . � 12 t$ 26 46 81 2 3t 3� �9 74 i4'9 <br /> 2�� 12 i7 24 4�0 8� 2� 20 3Q 4f 69 13§ <br /> 3 12 tf, 2? 37 �5 3 20 29 38 b4 128 <br /> 7• Tota!Number of Perforations equals the Number of Perforations per Lateral (Line 6)muttiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> C�Perf. Per Lateral X �-�Number of Perf. Laterals = �_�Total Number of Perf.__- <br /> 8. Calculate the Square Feet per Perforation. Recommended va(ue is 4-10 ftZ per perforation. °i^°""on°'�""`'��GP"� <br /> Poriwation Dtameter <br /> Does not apply to At-Grades �.°"n ,.e ,,,. ',, ',. <br /> Bed Area = Bed Width(ft)X Bed Length(ft) �,o• o.�e o.�� 0.% OJ4 <br /> 1.5 0.22 0-51 0.69 0.9 <br /> ��ftX � ft = ��fL2 zo° o.ze n.ss o.eo +.os <br /> � 2.5 0.29 0.65 0.89 7.17 <br /> 3.0 O.12 0.72 0-98 /-28 <br /> Square Foot per Perforation =Bed Area divided by the Tota(Number of PerforQtions (Line 7). •.o 0.3� 0.83 ,.,3 ,_<� <br /> 5.0` O,If �0.93 7.26 L65 <br /> Dwelli%S with 3/76 incA CO 1/4 iKA <br /> �ftZ ' � perforations = �ftZ/perforations ,r°°` a��o•ei�� <br /> u,.ruc�w;cn,�a incn perrowciorb <br /> 2feet OcherestaWishmenaandMSTSwfth3/76 <br /> 9. Setect Minimum Average Head: C�fL inch to 7Ia ixh peRora[iora <br /> 5 ftt� Ocher geaDtSshroents and N5T5 with t/8 inch <br /> perforatara <br /> 10. Setect Perforation Discharge (GPM)based on Tabte III: �GPM per Perforation <br /> 11• Determine required F(ow Rate by multiplying the Tota(Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.