My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design (2)
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
125 Bayside Trail - 06-117-23-22-0029
>
Septic
>
Septic design (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:17 PM
Creation date
9/10/2015 11:35:29 AM
Metadata
Fields
Template:
x Address Old
House Number
125
Street Name
Bayside
Street Type
Trail
Address
125 Bayside Tr
Document Type
Septic
PIN
0611723220029
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���- OSTP Mound Materiats Worksheet UNIVERSITY � � <br /> �,��� <br /> MionesotaPollution OF�INNESOTA :.�����-�: <br /> Control Agency ' <br /> ProjectlD: v 11.09.22 <br /> A. Calculate 8ed(rock)Volume:Bed Length (2.0 X Bed�dth 2.6)X Deptb =Volume ft3 <br /> 63.0 ft X 10.0 ft X t.0 = 630.0 ft' <br /> Qivide ft'by 27 ft3/yd'to calculate cubic ards: <br /> 630.0 ft3 : 27 = 23.3 yd' <br /> Add 20%for constructabitity: 23.3 yd'X 1.2 = 28.0 yd' <br /> B. Calculate C(ean Sond Votume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Medra Length =cubic feet <br /> 2.1 ft x 10.0 ft X 63.0 ft = 1312.5 ft' <br /> For a Mound on a slope from 0-t% <br /> Volume from Length=((Upstope Ahound Height-1)X Abwrption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Widih=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> To[ol Ciean Sand Volume:Volume(rom Length+Volume from Width+Volume Under Media <br /> {� + ft' + ft' = ��ft3 <br /> For a Mound on a stope greater than 1% <br /> Ups(ope Votume:((Upslope Mound Height -1)x 3 x Bed Length)�2=cubic feet <br /> (( 3.8 ft -�) X 3.0 ft x 63.0 )�z= 267.8 ft' <br /> Downstope Volume:((Downslope Height-1)x Dowrulope Absorpfion Width x Media Length)-�2=cubic feet <br /> {( 4.3 ft-�) X 16.0 ft X 63.0 )�2= 1680.0 ft3 <br /> Endsiope Vot�me:(Downslope Mouod Height- 1)x 3 x Medio Width =tubic feet <br /> ( 4.3 ft-1 ) X 3.0 ft X 10.0 ft = 100.0 ft3 <br /> Total Ctean Sond Volume:Upslope Volume +Oownstope Vo(ume +Endslope Volume +Volume Under Media <br /> 267.8 ft' + 1680.0 ft' � 100.0 ft' + 1312.5 ft'= 3360.3 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 3360.3 ft' : 27 = 124.5 yd' <br /> Add 20%for constructability: 124.5 yd'X 1-2 = 149.3 yd' <br /> C. Calculate Sandy 8erm Volume: <br /> Total Berm Vo(ume(approx):((Avg.Mound Height-0_5 ft topsoil)x Mound Widih x Mound Length)�2=cubic feet <br /> � 4,� _ 0.5 )ft X 42.5 ft X 89.0 )t 2= b779.4 ft' <br /> Tota!Mound Volume-Clean Sand votume-Rock Votume=cubic Jeet <br /> 6779.4 ft' - 3360.3 ft' - 630.0 ft' = 2789.1 ft3 <br /> Divide ft3 by 27 ft'/yd'to talculate cubic yards: 2789.1 fi3 : 27 = 103.3 yd' <br /> Add 20%for corntructability: 103.3 yd3 x 1.z = 124.0 yd' <br /> D. Calculate Topsoil Material Vo(ume:Tota!Mound Width X Totnl Mound Length X.5 ft <br /> 42.5 ft x 89.0 ft x o.5 ft = 1891.9 ft' <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 1891.9 ft3 : 27 = 70•1 yd' <br /> Add 20%for rnrntructability: 70.1 yd3 x 1.2 = 84.1 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.