My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
9/9/2015 3:03:41 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY , <br /> Minnesota Pollution Desi n W�rksheet *'`-�� _ - <br /> Control A enc g OF MINNESOTA �,���,� <br /> Project ID: v 11.09.22 <br /> 1. Setect Number of Perforated Latera(s in rystem/zone: � <br /> . . �,.,,,�.,�,.��.:,,,.:.�..., _ <br /> (2 feet is m�n►mum and 3 jeet is maximum spacing) <br /> �� -_` - - '� r _ <br /> 2. Select Perforotion Spacin3� 3.0 ft ' ' `5"' � ' - <br /> < �. <br /> ..��r.rir�r:�t�tr��s 4�:�c��d 3il:ili.�rt Mi��n�'rf 1z_ <br /> 3. Setect Perforation Diometer Size 7/32 in _ <br /> 5'ofro�k <br /> 4. Length of Loterals =Media Bed Length-2 Feet. �<.����.,���>���:��,,, �,. > �. P,�,<<,,.�i�o���n:,��,�n r„t' <br /> 63 - 2ft = 61 ft Perforation can not be doser then i foot from edge. <br /> 5- Determine the Number of Perforation Spaces. Divide the Length of Lotera(s (Line 4)by the Perforotion Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- ��ft = 20 Spaces <br /> 6. Number of Perforations per Laterai is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforotions Per Latero( = 20 Spaces + 1 = 21 perfs. Per Lateral <br /> Check tab(e be(ow to verify the number of perforations per lateral guarantees iess thon a f0%discharge voriation. The value is <br /> double if the a center manifo(d is used. <br /> Maximu.m Number of Fe�tecatiosu P�Latera[to Guarantee<1Q��scharge Variaiion <br /> �lnc�P�fcxani=�; 7!?1 Int!r P?rfarati�ns <br /> F��cration SFacng IF?�tl �p����``�''���'� Pe�faration Spacing Pipe D;arr�ter(lnchesl <br /> t i�! 11� 2 3 (Feetl { �t�, it� � � <br /> Z 1�5 13 18 3� 64 2 11 ib 2i 34 68 <br /> Z'" � !2 1 h 26 5�# 2 t 10 14 2C� 31 6�i <br /> 3 8 t2 16 25 52 3 9 14 19 30 60 <br /> 3;!1 b Inch Perorations t:8 Inch Pe�torat�om <br /> � Pi�a Diameter�Mchez) Fe�foration Sp�cing Pipe Qiameter(]nches) <br /> Pe,�c�rat:;on 5�,cng IF�tI <br /> 1 11•: t�. 2 3 (Feetl 1 i�: 9t; 2 3 <br /> 2 11 18 16 46 87 2 Zt 33 44 T4 149 <br /> �z� 12 t7 2�i 44 80 ��: 10 30 4t 69 135 <br /> � 12 16 21 31 75 3 20 29 38 64 12° <br /> 7• Tota(Number of Perforations equals the Number of Perforations per Latera( (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X ��Number of Perf. Laterats = 63 Totat Number of Perf. <br /> __ _. _ <br /> 8. Catculate the Square Feet per Perforation. Recommended value is 4-10 ftz per perforation. P�*'�•"°^°'�°h,��«P""� <br /> Does not app(y to At-Grades �<<aation Diameter <br /> Head(ft) _ <br /> ��a ��s ,�i r� <br /> Bed Areo = Bed Width(ft)X Bed Length(ft) ,.o• o.,$ 0.4, 0.56 0.�4 <br /> 1.5 0.32 O.St 0.69 0.9 <br /> 10 ft x 63 ft = 630 ftz Z.o° o.Zb o.s9 0.� ,.oa <br /> 2.5 0.29 0.65 0.89 1,17 <br /> 3.0 0.12 0.72 0.98 1.28 <br /> Square Foot per Perforotion =Bed Area divided by the Totol Number of Perforotions (Line 7). <.o 0.3� o.g3 ,.,3 ,.,� <br /> 5.0` 0.�1 0.93 1.2b 1.65 <br /> DwCllin [h 3/i6 inch[o t/4 irKh <br /> 630 ft2 - 63 perforations = 10.0 ft2/perforations '`°°` pertora w�� <br /> aveui�s wicn t is ixh peAoracio'rs <br /> 21eet p�tierr,tabti;hmi�ntsandM5T5with3176 <br /> 9. Select Minimum Average Head: 1.0 ft inch to t�4 inch pertoratior¢ <br /> 5 t�� Ocher eztabiishmrnts anO.MSTS wieh t/8 i'rch <br /> peAorat�orrs <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiptying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.