My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
9/9/2015 3:03:41 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materiats Worksheet UN[VERSITY � <br /> � <br /> Minnesota Pollution OF MINNESOTA `''' <br /> Controi Agenty -���� <br /> Project ID: ��� p9 ZZ <br /> A• Calcula[e Bed (rock)Vo(ume:Sed Length (2.C)X Bed Width 2.B)X Depth =Vo(ume (ft') <br /> 63.0 ft X 10.0 ft x �.0 = 630.0 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic ards: <br /> 630.0 ft' = v = 23.3 yd' <br /> Add 20%for construcWbility: 23.3 yd'X 1.2 = 2$,p yd3 <br /> B. Calculate Ctean Sond Volume: <br /> Volume Under Rock bed:Averoge Sand Depth x Media Width x Media Length =cubic feet <br /> 1.6 ft X 10.0 ft X 63,0 ft = 1008.0 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X ft - <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Totaf C(eon Sand Volume: Volume from Length+Vo(ume from Width+Volume Under Media <br /> ft3 + ft' + ft' = ft' <br /> For a Mound on a slope greater than 1% <br /> Ups(ope Vo(ume:((Upslope Mound Height -1)x 3 x Bed Length)=2=cubic feet <br /> (( 3.0 ft -�) X 3.o ft X 63.0 )�2= 189.0 ft' <br /> Downslope Volume: ((Downs(ope Height- 1)x Downslope Absorption Width x Media Length)-2=cubic feet <br /> (( 4.2 ft-1) X 10.0 ft X 63.0 )-2= 1008.0 �ft' <br /> Endslope Vo(ume:(Downs(ope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.2 ft-1 ) X 3.0 ft X 10.0 ft = 96.0 ft' <br /> Toto(Clean Sand Vo(ume:Upslope Volume +pawnslope Volume +Endslope Volume +Volume Under Medio <br /> 189.0 ft' + 1008.0 ft' � 96.0 ft' � 1008.0 ft'= 2301.0 ft' <br /> Divide ft'by 27 ft'/yd'to catculate cubic yards: 2301.0 ft' = 27 = $5.2 yd' <br /> Add 20%for constructability: 85.2 yd'X 1.2 = 102.3 yd3 <br /> G Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)�2=cubic feet <br /> ( 3.6 _ 0.5 )ft X 40.0 ft x 89.0 )=2= 5522J tt' <br /> Total Mound Yolume-Clean Sand volume-Rock Volume=cubic feet <br /> 5522.7 ft' - 2301.0 ft' - 630.0 ft; = 2591.7 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2591.7 ft' : z7 = 96.0 yd' <br /> Add 20%for constructability: 96.0 yd' X 1.2 = 115,2 yd3 <br /> D. Cat[ulate Topsoil Material Volume:Tota(Mound Width X Total Mound Length X.5 ft <br /> 40.0 ft X 89.0 ft X 0.5 ft = 1781.5 ft' <br /> Divide ft�by 27 ft'/yd'to calculate cubic yards: 1781.5 ft3 : 27 = 66.0 yd' <br /> Add 20%for constructability: 66.0 yd' x 1.2 = 79.2 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.