My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
9/9/2015 3:03:41 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> Minnesota Poilution UNIVERSITY - <br /> Controi A enc Design Worksheet OF MINNESOTA : ��,��,`�; <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated totera(s in system/zone: C� ---- <br /> (2 feet is minimum and 3 feet is moximum spocing) '°��`��•"����° ����• <br /> �� " _ .� __ r : <br /> 2. Setect Perforation Spacing: 3.0 ft "` " '�'`s ' " - -- <br /> � � <br /> '1>�.�In�.�tiuii��q�.�c..<I 3':���. Mi��mot r xk ±17.. <br /> 3. Setect Perforation Diameter Size 7/32 in _ <br /> �� 6.•i�l rnck <br /> 4. Length of Latera(s =Media Bed Length-2 Feet. ���������.���o�s�:�"�, , �„ ,: �,.,f�,,;,,;o„s�,a�,�4:�•,�3 <br /> 63 - 2ft = 61 ft Perforation con not be doser then 1 foot from edge. <br /> 5• Determine the Number of Perforation Spoces. Divide the Length of Loterals (Line 4)by the Perforation Spocing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft - �ft = 2p Spaces <br /> 6. Number of Perforations per Latero( is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Latera( = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table be(ow to verify the number of perforations per(ateral guarantees less than a f0%discharge variotion. The value is <br /> double if the a center manifo(d is used. <br /> t�ximu�-,Number of Pe�fa�ations F�Lateral to Cwarantee<{�n Discharge Variat�c� <br /> ',inc7 F'�torcons 7Ji2 in�h F'�!fGTehDt15 <br /> Pe�urat���S�actng IFeetl <br /> F��Diarraei�r{inches? Perforation S�cing Fip�e tT:ameter�fnches! <br /> t i�t 1z: Z 3 i.f�tl t tt: 1�� 1 x <br /> 2 1t� t3 18 30 60 2 11 16 Zt 3� b8 <br /> ��� 8 t2 ib 28 54 2�: !0 t� 20 32 54 <br /> 3 8 12 16 25 52 3 9 14 19 30 6C1 <br /> 3/16 Inch Pert�xations I'$Inch Po_rterati�ns <br /> F-r�fcra:•�n Spacing iFeet) <br /> �P'"���_�"{��x�s) Pe�foration Spacir� Pipe�ame#er(lnchesf <br /> 1 1u: i�: 2 3 (Feet) t ik_ tt: 2 3 <br /> t 11 18 26 4b 87 2 2t 33 44 74 1�9 <br /> 1t: 12 1? "[4 40 8t� ��� 20 3Q 41 59 135 <br /> } 12 16 22 37 TS 3 2� 29 38 64 12E <br /> 7• Tota(Number of Perforations equals the Number of Perforations per Latera( (Line 6) multiplied by the Number of <br /> Perforated Latero(s (Line 1). <br /> 21 Perf. Per Lateral X ��Number of Perf. Laterats = 63 Total Number of Perf. <br /> 8. Catculate the Square Feet per Perforation. Recommended value is 4-10 ft z per perforation. P�r�.e�w„o,��ne���c�,� <br /> Does not app/y to At-Grades PerforatlonDiametcr <br /> Head(!t) <br /> ,�e �/e '�i. '/� <br /> 8ed Area = Bed Width(ft)X Bed Length(ft) ,.o• o.�B o.4, o.sb o.�� <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ftZ =-°° °.� °.59 °.� ,.o; <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 O 96 1.2B <br /> Squo�e Foot per Perforation =Bed Area divided by the Tota(Number of Perforations (Line 7). j.o 0.3� o.e� ,.�, ,.., <br /> 5.0` 0.41 0.93 1,26 �.65 <br /> 630 fcZ - 63 perforations = 1 O.� ftZ/perforations �f�� PeNo'ra p�i�h 3n6�nch�o va inch <br /> Dwelli�wi[h i i8 irrch pMoracior¢ <br /> 2 fee[ O;her escoUh,hme�ts and N,575 wi[�;/16 <br /> 9. Select Minimum Average Head: 1.0 ft in[h to t ia inU pertoratior¢ <br /> s rrec a.ne��eaw�:nme�u a„a r+,srs wrtn,re���n <br /> peHoratbns <br /> 10. Select Perforation Dischorge (GPM) based on Table IIi: 0.56 GPM per Perforation <br /> 1�• Determine required Flow Rate by multiplying the Tota(Number of Perforatfons (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.