My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic design
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
100 Bayside Trail - 06-117-23-22-0026
>
Septic
>
Septic design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:07 PM
Creation date
9/9/2015 3:03:41 PM
Metadata
Fields
Template:
x Address Old
House Number
100
Street Name
Bayside
Street Type
Trail
Address
100 Bayside Tr
Document Type
Septic
PIN
0611723220026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials Worksheet UNIVERSITY �' <br /> Minnesota Pollution OF MINNESOTA � � <br /> Control Agency ��1;- <br /> ProjectlD: v 11.09.22 <br /> A• Calculate Bed (rock)Volume=Bed Length (2.0 X Bed Width (2.B)X Depth =Volume ft' <br /> 63.0 ft x 10.0 ft x t0 = 630.0 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic ards: <br /> 630.0 ft' = 27 = 23.3 yd3 <br /> Add 20%for constructability: 23.3 yd'X 1.2 = 28,0 yd' <br /> B. Calculaie Clean Sond Votume: <br /> Vo(ume Under Rock bed:Average Sand Depth x Media Width x Media Length =cubic feet <br /> 1.7 ft X 10.0 ft X 63.0 ft = 1092.0 ft' <br /> For a Mound on a siope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> ft -1) X X {t = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> ft -1) X X ft = <br /> Tota!Cleon$and Vo(ume: Volume from Length+Votume from Width+Volume Under Media <br /> ft3 + ft3 ' ft' = ft' <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)*2=cubic feet <br /> (( 3.3 ft -�) X 3.0 ft X 63.0 )�2= 220.5 ft' <br /> Downslope Vofume:((Downslope Height-1) x Downslope Absorption Width x Media Length)=2=cubic feet <br /> (( 4.1 ft-�) x 10.0 ft X 63.0 � )�2= 987.0 ft' <br /> Endslope Volume:(Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.1 ft-� ) x 3.o ft x 10.0 ft = 94.0 ft' <br /> Toto(Clean Sand Volume:Upslope Vo(ume +Downslope Volume +Endslope Volume +Volume Under Media <br /> 220.5 ft' + 987.0 ft' . 94.0 ft' • 1092.0 ft'= 2393.5 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2393.5 ft' = 27 = 88.6 yd' <br /> Add 20%for constructability: gg,6 3 = yd3 <br /> yd x i.2 10b.4 <br /> C. Calculate Sandy Berm Volume: <br /> Tota(Berm Volume(opprox):((Avg.Mound Height-0.5 ft topwil)x Mound Width x Mound Length)=2=cubic feet <br /> ( 3.7 _ 0.5 )ft x 40.0 ft x 87.0 )=z= 5626.0 ft' <br /> Totnl Mound Volume-Clean Sand vofume-Rock Volume=cubic feet <br /> 5626.0 ft' - 2393.5 ft' - 630.0 ft' = 2602.5 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 2602.5 ft' = Z7 = 96.4 yd' <br /> Add 20%for constructability: 96.4 yd' x �.2 = 115.7 yd' <br /> D. Calculate Topsoi(Moterial Volume:Total Mound Width X Tota!Mound Lenqth X.5 ft <br /> 40.0 ft X 87.0 ft X 0.5 ft = 1740.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 1740.0 ft' : 27 = 64.4 yd' <br /> Add 20%for constructability: 64.4 yd' x 1.2 = 77.3 3 <br /> yd <br />
The URL can be used to link to this page
Your browser does not support the video tag.