My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-14-2022 Council Packet
Orono
>
City Council
>
2022
>
03-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:45:17 PM
Creation date
5/24/2022 1:42:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 2 <br /> <br />1795 St. Clair Avenue | St. Paul, MN 55105 | (651) 696-5186 <br />www.oertelarchitects.com <br />Cost Estimate <br />Provide a cost estimate per option for staff review and consideration <br /> <br />Project Management and Coordination $1,820.00 <br />Work Task Staff Hours Rate Fee <br />Existing Building Review Project Manager 4 Hours $135 $ 540 <br /> Design Architect 2 Hours $100 $ 200 <br />Progress Meetings Project Manager 8 Hours $135 $ 1,080 <br />(Up to 4, 2-hour meetings or as required <br />for project duration) <br /> <br /> <br />Concept Planning $7,350.00 <br />Work Task Staff Hours Rate Fee <br />Programming Project Manager Included <br />Above <br />$135 $ 0 <br />Concept Design Project Manager 30 Hours $135 $ 1,350 <br /> <br /> <br />Design Architect 60 Hours $100 $ 6,000 <br /> <br />Engineering <br /> <br />In addition, we are requesting an allowance of $4,000 to be used on a hourly, as-needed basis for <br />mechanical/electrical/plumbing equipment and systems review of critical items determined during the <br />space needs identification. <br /> <br />Exclusions <br /> <br />Site Survey – Site Survey for the project, will be provided by others to the design team for use in the <br />design process. <br /> <br />Soil Testing / Engineering – These services will be provided by others to the design team for use in the <br />design process. <br /> <br />Third Party Ratings – This project scope does not include at this time any additional third-party rating <br />system (LEED, B3, Green Globes) and thus no additional specific meeting time or design deliverables are <br />anticipated. <br /> <br />Council Presentations – We anticipate City staff will provide any City Council presentations and periodic <br />updates. However, we would participate as required at our hourly rates for these additional meetings, or <br />within the scope of what we have defined as “Progress Meetings” if deemed necessary by City Staff.
The URL can be used to link to this page
Your browser does not support the video tag.