My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-09-2022 Council Packet
Orono
>
City Council
>
1950-2024
>
2022
>
05-09-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:18:31 PM
Creation date
5/24/2022 1:00:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Prepared By: Reviewed By: Approved By: <br />1.Purpose. The purpose of this item is to gain Council approval to complete a Master Plan and <br />Community Outreach for Summit Beach Park. <br />2.Background. The Summit Beach Committee met on March 4th, 2022 to establish a scope of work <br />for a master plan including public outreach for Summit Beach. The committee expressed a desire for the <br />work to be completed by a consultant. Staff solicited and received a proposal for our consulting <br />engineering firm, Bolton and Menk for such a project. Over the past several years the City has <br />undertaken several planning efforts and completed a number of improvement in and adjoining the <br />park. (See Exhibit A and references) The master plan for Summit Beach is intended allow for near <br />and long term improvements to be considered for the site for continued enjoyment by residents. The <br />associated cost estimates will be used to inform priorities and funding sources to be planned and <br />implemented as part of the City's capital improvement plan. <br />3.Scope of Work. This planning project has three main phases/components: <br />a.Creation of Conceptual Plans. <br />•Consolidate previous work and planning efforts for the park into conceptual plans. <br />•Meet with Staff and Park Committee to review conceptual plans. <br />b.Facilitate public engagement/ comment and review of conceptual plans. <br />•Develop outreach materials. <br />•Conduct open house, pop-up meetings and Online Survey. <br />c.Prepare masterplan summary report, graphic and cost estimate. <br />4.Cost. Bolton and Menk has proposed a not to exceed fee of $19,500. (Exhibit B) <br />5.Funding. Funding will come from the Park Dedication Fund. <br />6.Park Commsion Recommendation. The Park Commison reviewed the proposal at their May 2nd <br />meeting. They voted 5-1 to recommend approval of the project. <br />7.Impact to Other Parks Projects. The 2022 Parks Capital improvement Plan includes a playground <br />for Summit beach in 2023. The playground project will be postponed until 2024 or beyond depending on <br />the outcome of the master plan. <br />8.Timeline. The table below depicts the expected project timeline. <br />When What <br />May 23rd Council approves expenditure of fund and authorizes planning. <br />Jun 1st–Jul 31st Conceptual Plans and Public Engagement <br />Aug 1st Master Plan Draft Review ; Develop 2023 and beyond Parks CIP <br />Sep 6th Master Plan Approval; 2023 and beyond Parks CIP <br />Oct 10th Final Master Plan Acceptance; Approval of the 2023 and beyond Parks CIP <br />COUNCIL ACTION REQUESTED <br />Move to Approve the Master Plan project proposal for Summit Beach Park. <br />Item No.: 8 Date: May 9, 2022 <br />Item Description: Summit Beach Master Planning (Project 22-055) <br />Presenter: Adam Edwards, P.E. <br />City Administrator/Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.