My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-2022 Council Packet
Orono
>
City Council
>
2022
>
05-23-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:00:16 PM
Creation date
5/24/2022 12:57:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6 <br /> <br />220299v4A <br />the grading and before the City approves individual building permits on the lots, the Developer shall provide the <br />City with an “as constructed” grading plan certified by a registered land surveyor or engineer that all improvements <br />are completed according to the approved plan. Notwithstanding the foregoing, the City may issue building permits <br />to the Developer, prior to completion of all grading, provided the City Engineer has determined that adequate erosion <br />control measures are in place. The “as constructed” plan shall include field verified elevations of the following: a) <br />location and elevations along all swales, and ditches; and b) lot corner elevations. <br /> 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from <br />construction work by the Developer, builders, subcontractors, their agents or assigns, at least once per week and <br />more frequently as needed. Prior to any construction on the Land, the Developer shall identify in writing a <br />responsible party and schedule for erosion control, street cleaning, and street sweeping. <br /> 17. CONSTRUCTION AND MAINTENANCE OF IMPROVEMENTS. The Developer shall <br />construct a private road on the Land to provide access to the three lots.. Before the City signs the Plat, the <br />Developer shall provide the City with an appropriately executed private covenant, homeowners’ association <br />agreement, or other private restriction regarding the private road and its maintenance. Such an instrument must <br />be recorded and provide that the private road will be maintained to reasonable standards at all times. Upon <br />completion of the Improvements, the City shall inspect the Improvements and notify Developer if any of the <br />Improvements do not conform to the requirements of this Contract. <br /> 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. <br />Developer shall, contemporaneously with the execution of this Contract, maintain an escrow account with the City <br />of $10,000 to cover the cost of engineering fees and construction observation, legal fees, planning fees, <br />administrative expenses and other costs related to this Development. City engineering administration will include <br />monitoring of construction observation, consultation with Developer and its engineer on status or problems <br />regarding the project, coordination for final inspection and acceptance, project monitoring during the warranty
The URL can be used to link to this page
Your browser does not support the video tag.