Laserfiche WebLink
<br />6 <br /> <br />220299v4A <br />the grading and before the City approves individual building permits on the lots, the Developer shall provide the <br />City with an “as constructed” grading plan certified by a registered land surveyor or engineer that all improvements <br />are completed according to the approved plan. Notwithstanding the foregoing, the City may issue building permits <br />to the Developer, prior to completion of all grading, provided the City Engineer has determined that adequate erosion <br />control measures are in place. The “as constructed” plan shall include field verified elevations of the following: a) <br />location and elevations along all swales, and ditches; and b) lot corner elevations. <br /> 16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted from <br />construction work by the Developer, builders, subcontractors, their agents or assigns, at least once per week and <br />more frequently as needed. Prior to any construction on the Land, the Developer shall identify in writing a <br />responsible party and schedule for erosion control, street cleaning, and street sweeping. <br /> 17. CONSTRUCTION AND MAINTENANCE OF IMPROVEMENTS. The Developer shall <br />construct a private road on the Land to provide access to the three lots.. Before the City signs the Plat, the <br />Developer shall provide the City with an appropriately executed private covenant, homeowners’ association <br />agreement, or other private restriction regarding the private road and its maintenance. Such an instrument must <br />be recorded and provide that the private road will be maintained to reasonable standards at all times. Upon <br />completion of the Improvements, the City shall inspect the Improvements and notify Developer if any of the <br />Improvements do not conform to the requirements of this Contract. <br /> 18. CITY ENGINEERING ADMINISTRATION AND CONSTRUCTION OBSERVATION. <br />Developer shall, contemporaneously with the execution of this Contract, maintain an escrow account with the City <br />of $10,000 to cover the cost of engineering fees and construction observation, legal fees, planning fees, <br />administrative expenses and other costs related to this Development. City engineering administration will include <br />monitoring of construction observation, consultation with Developer and its engineer on status or problems <br />regarding the project, coordination for final inspection and acceptance, project monitoring during the warranty