My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-23-2022 Council Packet
Orono
>
City Council
>
2022
>
05-23-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2022 1:00:16 PM
Creation date
5/24/2022 12:57:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5 <br /> <br />220299v4A <br />course placement must have the written approval of the City Engineer, and may be delayed or scheduled at any time <br />of the year based upon existing site conditions at the discretion of the City Engineer. <br /> 13. LICENSE. The Developer hereby grants the City, its agents, employees, officers, and contractors <br />a license to enter the Land to perform all work and inspections deemed appropriate by the City in conjunction with <br />development of the Land. <br /> 14. EROSION CONTROL. Prior to initiating site grading all required erosion controls shall be <br />implemented by the Developer and inspected and approved by the City. Developer must adhere to Best Management <br />Practices for Protecting Water Quality in Urban Areas and to the approved SWPPP. The City may impose additional <br />erosion control requirements if reasonably required. All areas disturbed by excavation and backfilling operations <br />shall be reseeded within five (5) days after the completion of the work, weather permitting, or in an area that is <br />inactive for more than ten (10) days unless authorized and approved by the City Engineer. Except as otherwise <br />provided in the erosion control plan, seed shall be in accordance with the City's current seeding specification which <br />may include certified oat seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be <br />fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the <br />essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule or <br />supplementary instructions received from the City, the City may take such action as it deems appropriate to control <br />erosion. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City <br />to do so will not affect the Developer’s and City’s rights or obligations hereunder. If the Developer does not <br />reimburse the City for any cost the City incurred for such work within ten (10) days, the City may draw down the <br />“security” to pay any costs. No development, utility, or street construction will be allowed and no building permits <br />will be issued unless the Land is in full compliance with the approved erosion control plan. <br /> 15. GRADING PLAN. The land within the plat shall be graded in accordance with the City-approved <br />Grading Plan. The plans shall conform to City of Orono specifications. Within thirty (30) days after completion of
The URL can be used to link to this page
Your browser does not support the video tag.