My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info - 1980's
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Road
>
4440 Bayside Road - 31-118-23-34-0012
>
Septic
>
Septic info - 1980's
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:31:48 PM
Creation date
9/2/2015 4:15:04 PM
Metadata
Fields
Template:
x Address Old
House Number
4440
Street Name
Bayside
Street Type
Road
Address
4440 Bayside Road
Document Type
Septic
PIN
3111823340012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#804 - Painters Creek <br /> April 17 , 1984 <br /> Page 2 ', <br /> - Reported perc rates averaged 16 MPI rimary, 18 MPI alternate in top <br /> foot of soil <br /> - Depth to seasonal saturation zone rep rted at 4-5 . 5 ' <br /> - Soil survey indicates Kilkenny Loam a tested sites <br /> - Again, I would recommend 2 ' wide tren hes maximum, not more than 1 ' deep <br /> - A curtain drain may have some benefit, but the borings again indicate <br /> fine textured soils which resist drai age <br /> Lot 3 - (Sites 11A & 11B) <br /> - Slope at tested sites averaged 12-18$ <br />: - Topographic location - good <br /> - Site drainage appears OK <br /> - House siting capability - poor- due t road and drainfield site location , <br /> a 50 ' setback places the likely house location just above the drainfield <br /> site . I would suggest either reali�gni g the road or allowing a setback <br /> less than 50 ' to the road outlot. Bec use the sites extend the width <br /> of the lot, the shape and location of house would appear quite limited <br /> if no changes are made <br /> - Reported perc rates average 13 MPI pri ary, 23 MPI alternate at the <br /> tested site <br /> - Depth to seasonal saturation zone 4 ' -5 ' ; trench depths could possibly be <br /> 18-24" in primary site, 12" in alterna e site <br /> - Soil survey indicates Kilkenny Loam <br /> - Recommend maximum trench width 2 ' due o the slopes <br /> Lot 4 (Sites 12A & 12B) <br /> - Slope at tested sites averages 8-16� <br /> - Topographic location - OK <br /> - Site drainage - OK <br /> - House siting capability - Appears OK, ouse site establishment recommended <br /> - Reported perc rates average 33 MPI pri ary, 6 MPI alternate , in upper <br /> foot <br /> - Depth to seasonal saturation reported t 4 . 5-5 . 5 ' <br /> - Soil survey indicates Kilkenny Loam at tested sites <br /> - Trench system should be no deeper than 2 ' in primary site , 18" in alternate <br /> site , suggest trenches 2 ' wide maximum <br /> Lot 5 (Sites 13A & 13B) <br /> - Slopes at tested sites average 2-10$ <br /> - Topographic location good <br /> - Site drainage OK, note that drainfield sites for Lots 5 & 6 are adjacent <br /> - House siting capability - OK, recommen establishing a house site envelope <br /> to protect drainfield areas <br /> - Reported perc rates average 34 MPI pri ary, 20 MPI alternate <br /> - Soil borings indicate better-drainec� s ils, seasonal saturation zones <br /> below 5 ' . Trenches can be up to 2 ' de p, 3 ' wide, may need basement <br /> lift pump <br />
The URL can be used to link to this page
Your browser does not support the video tag.