My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info for division
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
Septic info for division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:29 PM
Creation date
9/1/2015 12:28:03 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials W rksheet UNIVERSITY ' „ <br /> Minnesota Paliution OF MINNESOTA �.4��;, <br /> Control Agency - <br /> ProjectlD: v 11.09.22 <br /> A. Catculate Bed (rock)Volume:Bed Length (2.0 X Bed Width 2.B)X Depth =Volum ft' <br /> 63.0 ft x 1 .0 ft x 1.0 = 630.0 ft' <br /> Divide ft'by 27 ft'/yd'to calculate c bic ards: <br /> 63 .0 ft' : 27 = 23.3 yd' <br /> Add 20%for co�structability: 2 .3 yd'X 1-2 = 28.0 yd' <br /> B. Calcutate C(ean Sand Volume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Media Length =cub feet <br /> 2.4 ft X 10.0 ft X 63.0 ft = 1480.5 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X ia Bed Width) <br /> ft -1) X X ft = <br /> Total Cleon Sond Volume:Volume from Length+Volume from Width+Volume Un r Media <br /> ft' * ft' + ft' = ft' <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Ups(ope Mound Height - 1)x 3 x Bed Length)�2=cubic feet <br /> (( 4.0 ft -t) x 3.o ft X 63.0 )�2= 283.5 ft' <br /> Downs(ope Volume:((Downs(ope Height- 1) x Downstope Absorption Width x Medi Length)=2=cubic feet <br /> (( 4.7 ft-1) X 10.0 ft x 63.0 )�2= 1165.5 ft' <br /> Endslope Volume:(Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.7 ft-1 ) X 3.0 ft X 10.0 ft = 111.0 ft' <br /> Total Cleon Sand Votume:Upstope Votume +pownslope Volume +Endslope Volum +Volume Under Medio <br /> 283.5 ft' + 1165.5 ft' + 111.0 ft' + 1480.5 ft'= 3040.5 ft' <br /> Divide ft3 by 27 ft'/yd'to calcutate cubic yards: 30 0.5 ft3 = 27 = 112•6 yd' <br /> Add 20%for constructability: 11 .6 yd'X 1.2 = 135.1 yd' <br /> C. Calculate Sondy Berm Volume: <br /> Total Berm Vo(ume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x und Length)=2=cubic feet <br /> ( 4.4 _ 0.5 )ft x 45.0 ft X 91.0 )=2= 7883.6 ft' <br /> Tota!Mound Volume-Clean Sond volume-Rock Volume=cubic feet <br /> 7883.6 ft' - 3040.5 ft' - 630.0 fc' = 4213.1 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 42 3.1 ft' : 27 = 156.0 yd' <br /> Add 20%for constructability: 1 6.0 yd' x 1.2 = 187•2 yd' <br /> D. Calculate Topsoil Material Volume:Total Mound Width X Tota!Mound Lenqth X.5 <br /> 45.0 ft x 91.0 ft x o.5 ft = 2047.7 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 20 7J ft' : 27 = 75•8 yd' <br /> Add20%forconstructability: 7 ,$ yd3 x 1,2 = g�•p Yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.