My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info for division
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
Septic info for division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:29 PM
Creation date
9/1/2015 12:28:03 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � OSTP Pressure Distri ution <br /> �1NIVERSITY .� <br /> Minnesota Poliution Design Workshe t OF MINNBSOTA <br /> Control A enc ,��a.��.. <br /> ProjectlD: v 11.09.22 <br /> 1. Select Number of Perforated Latera(s in system/zone: �� _ <br /> (2 feet is minimum and 3 feet is maximum spacing) ",,,,,`..,,", ,,,, <br /> � • '-� <br /> 2. Select Perforation Spacing: 3.0 f ' " „'` ' " - <br /> �• � <br /> (� Mir�irni��� <br /> �� /.._��ivlo�:�tiom�.��.�c�•cl 3':i��.�rt i".J'M rack j j=-�� <br /> 3. Setect Perforotion Diameter Size 7/32 � _ _ <br /> 6'nf��x-k <br /> 4. Length of Laterals =Media Bed Length-2 Feet. �'^����.,���^�,r�^�, '�- �•� �,>����.,���":��������:l «�� <br /> 63 - 2ft = 61 ft Perforation can ot be doser then 1 foot from edge. <br /> 5• Determine the Number of Perforation Spoces. Divide the Length of late als (Line 4) by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- 3 ft = 20 Spaces <br /> 6. Number of Perforations per Latera( is equal to 1.0 plus the Number of P rforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per(oteral guar ntees less thon Q 10%discharge variation. The value is <br /> double if the a center monifold is used. <br /> Maximum Nvmber of Ferforati�ns Pea�Lateral to Gua ntee<t�t D�scharge l�ariatio�n <br /> �lnth P�tc�a#ions 7`32 Inrh Pe�oracions <br /> Pipe Diarneter finches) Perfo tion Spacing Pipe Q;ametEr(Inchesk <br /> P?�fcrac:o�Spar:nq IFeat) <br /> 1 1s: 1'�� 1 ; (Feet) t tt; 1�; 2 3 <br /> Z 10 13 i8 30 60 2 11 15 21 34 68 <br /> �°: E 12 15 28 54 2t 10 1-0 2Q 32 64 <br /> 3 8 12 16 25 52 ? 9 14 19 3(} 60 <br /> ?.'16 Inch Perforaiiuns i�81nch Perfarations <br /> Pipe Diameier tinct�sl Ferfa tion Spacir� Pipe D�ame#er flnches) <br /> Ferforat�on Spat�n�iFertl <br /> 1 1Y. 1+< "t 3 iFe�eti 1 tt: tt: Z 3 <br /> 2 12 18 2fi 4b 87 2 21 33 44 74 149 <br /> It: 12 17 24 4�? $�J 2%: 24 3� �i b� i35 <br /> � 1t t6 22 37 75 3 20 ZQ 38 b4 12$ <br /> 7• Total Number of Perforations equals the Number of Perforations per Lat ra( (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X �Number of Pert. Laterals = 63 Total Number of Perf. <br /> 8. Calcutate the Squore Feet per Perforotion. Recommended vo(ue is 4-10 f � per perforation. P����•�b^DSSOAif�16°""� <br /> Does not apply to At-Grades PerforaHonDfameter <br /> Mcad(/t) <br /> ��a ��• '/�: �/. <br /> Bed Area = Bed Width(ft)X Bed Length(ft) ,.o• o.,e o.a, 0.56 0.�. <br /> 1.5 0.22 0.57 0.69 0.9 <br /> 10 ft x 63 ft = 630 ft Z°° °.� °.5' °.� ,.°° <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 0.98 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of erforations (Line 7). <.o 0.3� 0.8� ,.,3 ,.4� <br /> 5A` O.it 0.93 1.26 1.65 <br /> 630 ftZ = 63 perforations = 10. ftZ/perforations �t�� �eo6 ro�th i/t6 inch to t/a irch <br /> DwelU�s vrith 1/8 inc�peAora[iom <br /> 2!ee[ O:her establizhments and ni,STS wi[h 3/�6 <br /> 9. Select Minimum Average Head: 1.0 ft inch to t/n inc�peAoratia�¢ <br /> 5 fcet aher e:tablk.hmen[s and hSTS with t/8 inch <br /> peAorntiona <br /> 10. Select Perforotion Discharge (GPM)based on Tabte III: 0.5 GPM per Perforation <br /> 11• Determine required F(ow Rate by multiplying the Tota(Number of Perfor tions (Line 7}by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.