My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info for division
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
Septic info for division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:29 PM
Creation date
9/1/2015 12:28:03 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� OSTP Pressure Distri ution <br /> UNIVERSITY `� <br /> Minnesota Poltution Design Workshee OF MINNESOTA �'`"" � <br /> Control A enc ,,_��- <br /> ProjectlD: v 11.09.22 <br /> 1. Setect Number of Perforated Latera(s in rystem/zone: �� _ __ <br /> (2 feet is minimum and 3 feet is maximum spacing) ",,°,,,,,"" ,,' <br /> Z. Select Perforation Spacing: 3.0 ft ' - - ', :s ' "., � ' _ - <br /> �� <br /> '�ii�r1�, ,v.�<.�•c13':.�w. ii��J'Tof��rir.k T-t1- ' <br /> 3. Select Perjorotion Diameter Size 7/32 in _ _ <br /> C.'��I ro<k <br /> 4. Length of Latera(s =Media Bed Length -2 Feet. �,.�'��.,���,^�;:�^�, , ��',. �<<���,,;��^�.�>.�<���,:7 �„� <br /> 63 - 2ft = 61 ft Perjoration can ot be doser then 1 foot from edge. <br /> 5• Determine the Number of PerJoration Spaces. Divide the length of Late ls (Line 4)by the Perforation Spacing {Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft .- 3 ft = 20 Spaces <br /> 6. Number of Perforations per Latera( is equal to 1.0 plus the Number of Pe foration Spaces (Line 5). <br /> Perforations Per Latera! = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check tQble below to verify the number of perforations per latera(guara tees(ess than a 10%discharqe variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Pe�foratior�s Per Latera!to Guar ntee<IPe Q�scharge Yareatian <br /> ,Incn P�*fc�rahons 7/32(ntn Perferatio�s <br /> F1pe tJiarnet�r�inches) Perfo ci�n Spacing Pipz Gtameter({nches) <br /> Perfcrat���Spac°ng IFeetl � 3 <br /> t tY: 1�". 2 3 (Feet! � �tf ��; <br /> � 10 13 16 30 bQ 2 11 16 21 34 68 <br /> �ti: 8 12 �6 26 54 2�: 1Q 14 2G 32 6�f <br /> 3 8 12 ib 25 52 3 9 1� 19 30 bQ <br /> 3:'I b Inch Pertorations 1:8 Intn P?a-ferac�om <br /> Ptipe Diam�ter 4lnches) �erf tion Spaci+� Fipe[�ar�e#er(6nthes) <br /> Fe�c-ra.�:o�Spa��ng{Fe?ti - <br /> f 4�: 1i4 "t 3 (Feet) t tt, iti� � 3 <br /> 2 1Z 18 26 4fi 87 � 2i 33 44 74 149 <br /> t�: 12 17 2� 44 �0 7�: 2� 30 4t 69 13� <br /> 3 t2 1� Z2 37 75 3 20 29 �8 54 1�8 <br /> 7• Total Number of Perforations equats the Number of Perforations per Lat ra( (Line 6)multiplied by the Number of <br /> Perforated Laterats (Line 1). <br /> 21 Perf. Per Lateral X �Number of Perf. aterals = 63 Totat Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 f Z per perforation. P�ra,��on�ti..�,��„ <br /> Does not apply to At-Grades ao.toranoa mameter <br /> Noaa�rc) <br /> �/a �/e -/�: �/. <br /> Bed Area = Bed Width (ft)X Bed Length(ft) �.a• o.ie o.s� o.ss o.�4 <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ftZ Z°° °.2` °." °.� ,.°` <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.72 0.72 0.9B 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of rforations (Line 7). =.o o.» o.e= ,.,3 ,.•� <br /> S.O` 0.41 0.97 1.26 1.65 <br /> 630 ft2 = 63 erforations = z ,��� °"`e�`"'��`h'�,6`,�n`°,�.;rch <br /> p 10.0 ft /perforations oeno.a�m�s <br /> �vrelling,viiN t l8 inch perforatioz <br /> 9. Select Minimum Avera e Head: 1.0 ft 2 f�� a�r establishments and M5T5 wiiA��,b <br /> � �nch to tiA mch peAoratqrts <br /> 4��� O:her r.cablishmrnts and�575 wi[A t/8 inch <br /> peAorations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11• Determine required Flow Rate by multiptying the Tota(Number of Perfor tions �Line 7)by the Perforotion Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.