My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Septic info for division
Orono
>
Property Files
>
Street Address
>
B
>
Bayside Trail
>
75 Bayside Trail - 06-117-23-22-0030
>
Septic
>
Septic info for division
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:25:29 PM
Creation date
9/1/2015 12:28:03 PM
Metadata
Fields
Template:
x Address Old
House Number
75
Street Name
Bayside
Street Type
Trail
Address
75 Bayside Tr
Document Type
Septic
PIN
0611723220030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Mound Materials W rksheet UNIVERSITY ` y' <br /> Minnesota Pollution OF MIN�'ESOTA � �'` <br /> Control Agency ����-� <br /> ProjectlD: ���.pq,22 <br /> A. Calculate Bed (rock)Volume:Bed Length (2.0 X Bed Width (2.B)X Depth =Vo(u ft' <br /> 63.0 ft X 1 .0 ft x t.0 = 630.0 ft' <br /> Divide ft'by 27 ft'/yd3 to catculate bic ards: <br /> 63 .0 ft' : z7 = 23.3 yd' <br /> Add 20%for constructability: 2 .3 yd3 X 1.2 = 28.0 yd' <br /> B. Calculate Clean Sand Votume: <br /> Volume Under Rock bed:Average Sand Depth x Media Width x Medra Length =cub feet <br /> 2.3 ft X 10.0 ft x 63.0 ft = 1449.0 ft' <br /> For a Mound on a slope from 0-1% <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed Media Bed Length) <br /> ft -1) X X ft = <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X ia Bed Width) <br /> ft -1) X X ft = <br /> Tota!C(ean Sand Volume:Volume from Length+Volume from Width+Volume Un r Media <br /> ft' + ft� + ft3 = ft3 <br /> For a Mound on a slope greater than 1% <br /> Upslope Volume:((Upslope Mound Height - 1)x 3 x Bed Length)*2=cubic feet <br /> (( 4.0 ft -1) x 3.O ft X 63.0 )T 2= 283.5 ft' <br /> Downslope Volume:((Downslope Height-1) x Downslope Absorption Width x Medi Length)*2=cubic feet <br /> (( 4.6 ft-t) x 10.0 ft x 63.0 )�2= 1134.0 ft' <br /> Endstope Vo(ume:(Downslope Mound Height- 1) x 3 x Media Width =cubic feet <br /> ( 4.6 ft-7 ) X 3.0 ft X 10.0 ft = 108.0 ft' <br /> Total Clean Sand Volume:Upslope Volume +Downs(ope Volume +Endslope Vo(um +Volume Under Media <br /> 283.5 ft' + 1134.0 ft' + 108.0 ft' + 1449.0 ft'= 2974.5 ft' <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 29 4.5 ft' : 27 = ���•2 yd' <br /> Add 20%for constructability: 11 .2 yd'X 1-2 = 132.2 yd' <br /> C. Calculate Sandy Berm Vo(ume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x und Length)+2=cubic feet <br /> ( 4.3 _ 0.5 )ft x 44.4 ft x 90.6 )*2= 7635.4 ft' <br /> Tota!Mound Volume-Clean Sand volume-Rock Volume=cu6ic feet <br /> 7635.4 ft' - 2974.5 ft' - 630.0 ft' = 4030.9 ft' <br /> Divide ft'by 27 ft3/yd'to calculate cubic yards: 40 0.9 ft' : Z7 = 149.3 yd' <br /> Add 20%for constructability: 1 9.3 yd' x 1.2 = 179.2 yd' <br /> D. Calculate Topsoil Material Vo►ume:Toto1 Mound Width X Total Mound Lenqth X.5 <br /> 44.4 ft X 90.6 ft X 0.5 ft = 2009.�ft' <br /> Divide ft'by 27 ft'/yd'to calcutate cubic yards: 20 9.3 ft' = 27 = 74.4 yd' <br /> Add 20%for constructability: 7 .4 yd' x i•z = 89•3 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.