My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-2022 Development Contract
Orono
>
Property Files
>
Street Address
>
P
>
Pence Lane
>
2710 Pence Lane - 21-117-23-23-0051/46
>
Land Use
>
03-01-2022 Development Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:04:44 PM
Creation date
3/4/2022 10:06:50 AM
Metadata
Fields
Template:
x Address Old
House Number
2710
Street Name
Pence
Street Type
Lane
Address
2710 Pence La
Document Type
Land Use
PIN
2111723230061
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
does not reimburse the City for any cost the City incurred for such work within ten (10) days, the <br />City may draw down the "security" to pay any costs. No development, utility, or street construction <br />will be allowed and no building permits will be issued unless the Land is in full compliance with <br />the approved erosion control plan. <br />15. GRADING PLAN. The Land shall be graded in accordance with the approved <br />Plan C — Grading. The plans shall conform to City of Orono specifications. Within thirty (30) days <br />after completion of the grading and before the City approves individual building permits on the lots, <br />the Developer shall provide the City with an "as constructed" grading plan certified by a registered <br />land surveyor or engineer that all improvements are completed according to the approved plan. <br />Notwithstanding the foregoing, the City may issue building permits to the Developer, prior to <br />completion of all grading, provided the City Engineer has determined that adequate erosion control <br />measures are in place. The "as constructed" plan shall include field verified elevations of the <br />following: a) location and elevations along all swales, and ditches; and b) lot corner elevations. <br />16. CLEAN UP. The Developer shall clean dirt and debris from streets that has resulted <br />from construction work by the Developer, builders, subcontractors, their agents or assigns, at least <br />once per week and more frequently as needed. Prior to any construction on the Land, the Developer <br />shall identify in writing a responsible parry and schedule for erosion control, street cleaning, and <br />street sweeping. <br />17. CONSTRUCTION AND MAINTENANCE OF IMPROVEMENTS. <br />Developer shall enter into and execute a declaration of covenants regarding the private road <br />easement and maintenance of said road. Upon completion of the Improvements, the City shall <br />inspect the Improvements and notify Developer if any of the Improvements do not conform to the <br />requirements of this Contract. <br />Gf <br />
The URL can be used to link to this page
Your browser does not support the video tag.