My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-01-2022 Development Contract
Orono
>
Property Files
>
Street Address
>
P
>
Pence Lane
>
2710 Pence Lane - 21-117-23-23-0051/46
>
Land Use
>
03-01-2022 Development Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:04:44 PM
Creation date
3/4/2022 10:06:50 AM
Metadata
Fields
Template:
x Address Old
House Number
2710
Street Name
Pence
Street Type
Lane
Address
2710 Pence La
Document Type
Land Use
PIN
2111723230061
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 15th and September 15th the first summer after the base layer of asphalt has been in place <br />one freeze thaw cycle. The Developer may, however, request an extension of time from the City. If <br />an extension is granted, it shall be conditioned upon updating the "security" to reflect cost increases <br />and the extended completion date. Final wear course placement must have the written approval of <br />the City Engineer, and may be delayed or scheduled at any time of the year based upon existing site <br />conditions at the discretion of the City Engineer. <br />13. LICENSE. The Developer hereby grants the City, its agents, employees, officers, <br />and contractors a license to enter the Land to perform all work and inspections deemed appropriate <br />by the City in conjunction with development of the Land. <br />14. EROSION CONTROL. Prior to initiating site grading, Plan C — Grading, <br />including all required erosion controls, shall be implemented by the Developer and inspected and <br />approved by the City. The City may impose additional erosion control requirements if reasonably <br />required. All areas disturbed by excavation and backfilling operations shall be reseeded within five <br />(5) days after the completion of the work, weather permitting, or in an area that is inactive for more <br />than ten (10) days unless authorized and approved by the City Engineer. Except as otherwise <br />provided in the erosion control plan, seed shall be in accordance with the City's current seeding <br />specification which may include certified oat seed to provide a temporary ground cover as rapidly <br />as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed <br />retention. The parties recognize that time is of the essence in controlling erosion. If the Developer <br />does not comply with the erosion control plan and schedule or supplementary instructions received <br />from the City, the City may take such action as it deems appropriate to control erosion. The City <br />will endeavor to notify the Developer in advance of any proposed action, but failure of the City to <br />do so will not affect the Developer's and City's rights or obligations hereunder. If the Developer <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.