My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-14-2022 Council Packet
Orono
>
City Council
>
2022
>
02-14-2022 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2022 3:20:52 PM
Creation date
2/15/2022 3:18:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
21 <br /> <br />21-021 <br />Forcemain <br />Replacements <br />Tonkawa PH2 <br />This project will replace aging force main along <br />Tonkawa Road. <br />This project was completed early in 2021 <br />and was a precursor to the pavement work <br />on Park and Elm. The project exceeded <br />budget due to underground utility conflicts <br />and location issues. <br />21-022 <br />Walters Port <br />Water Main <br />Replacement <br />Replacement of Water main and hydrants in <br />conjunction with the private road replacement <br />The project was completed in 2021. The <br />project included a significant change order <br />with additional pipe, service connection ad <br />hydrants added. The project came in on <br />budget. <br />21-026 <br />Casco Point <br />Stormwater <br />Improvements <br />The project consists of three items from the <br />surface Water Management Plan (SWMP): <br />retrofit of the bio retention basin (CB-1); <br />construction of an control structure (O-1); and <br />installation of a sump manhole at the south end <br />of Casco Point Rd (CB-2). <br />This project was incorporated into the <br />Streets project. <br />21-028 <br />Fagerness <br />Point <br />Stormwater <br />Project <br />The project consists installation of curb and <br />gutter, catch basins and storm pipes. <br />This project was incorporated into the <br />Streets project. <br />21-039 New <br />Public Works <br />Facility <br />The project includes the procurement of a site, <br />design, site preparation, utility extension and <br />construction of a new Public Works Facility. <br />The project is expected to be complete in <br />2023. 2021 activity included preliminary <br />design and Bonding. <br /> <br />9.04. Support to Staff Departments. Provide support to the Planning and Zoning department through review <br />of grading plans and development plans. <br /> <br />Strategy Measure Target 2020 2021 <br />Complete Grading <br />Reviews <br />Number of building permit Grading <br />reviews completed <br />100% of those <br />required <br />390 244 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.