Laserfiche WebLink
<br />H:\ORNO\2022 New Projects\Fee Estimate - Tonkawa Phase Forcemain Replacement .docx <br /> <br />January 18, 2022 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br /> <br />RE: 2022 Tonkawa Forcemain Replacements Project – Design and Bidding Services <br /> <br />Dear Adam: <br /> <br />As requested, we have prepared a scope of services and design fee estimate for the proposed 2022 <br />Tonkawa Forcemain Replacements Project. It is our understanding that the scope of the project will <br />include the replacement of approximately 3,700 feet of forcemain along Tonkawa Road. This project is a <br />continuation of work that began in 2009 and was continued in 2013 and 2021. <br /> <br />Proposed Scope of Engineering Services <br />To assist the City with this improvement project, Bolton & Menk proposes the following scope of <br />services: <br /> <br />Topographic Survey – We will document existing conditions and location of the watermain as necessary <br />to construct the proposed improvements. <br /> <br />Staff Design Meetings – Our team will work with City staff to develop the scope of the project and to get <br />input on design details. The goal of these meetings is to ensure that the project is designed consistent <br />with City standards and that the City’s maintenance practices and operations are considered throughout <br />the design process. <br /> <br />Detailed Design and Bidding – Once the final scope of the project is determined, Bolton & Menk will <br />prepare detailed plans and specifications and obtain all necessary permits. This work will include <br />coordination with private property own ers as needed. Upon authorization, the project will be advertised <br />for competitive bids. Bolton & Menk will administer the bidding process and will ultimately make a <br />recommendation to the City Council about awarding the project. <br /> <br />Fee Estimate <br />Based on the scope of services described above, we propose a not -to -exceed fee of $39,500 to be billed on <br />an hourly basis. Once the Construction Contract is awarded, Bolton & Menk will prepare a separate <br />scope and fee estimate for construction phase services. <br /> <br />