Laserfiche WebLink
From:Anderst, Gary <br />To:Jeremy Barnhart <br />Subject:Parking Lot and Other Improvements <br />Date:Tuesday, January 11, 2022 5:53:18 PM <br />Hi Jeremy, <br />I appreciate your time and input today. I have a few comments regarding the current set up of the <br />parking lot and options for more of and integration of development and flow of the space on the <br />Narrows LLC side. <br /> <br />1. After looking at the lay out of the design and placement of the planters on the SE side, will <br />this blockade really stop motorists from going around the planter through the space on the <br />Narrows side? When the lot is empty it would not be an issue but when it is busy, I could see <br />this maybe a set up for problems for others parking on both sides of the property line in that <br />row of spaces. <br />2. Item 1 brings up item 2. Should we look at a more global plan including the space on the <br />Narrows property so there is more of a flow. We discussed that a global plan and resurfacing <br />of that space would be best as to contour the grading consistent along with surfacing at the <br />same time. Doing these as separate projects without a common plan would not optimize the <br />overall goals. We would be interested in discussing options with the City Engineer along with <br />contractors that are awarded the work to set up a secondary project tied to the overall City <br />project. We would want to keep the bidding and project costs from our property separate <br />from the public project but at the same time make sure it is completed as one blending the <br />two areas together as one connected plan. <br />3. Item 2 would need to incorporate item 3. We have two dumpsters that are on our property <br />that we would like to enclose to assist with cleaning up the look around the property. It <br />would be our hope that we could reduce the amount of community dumping into our <br />dumpsters utilizing an enclosure. Working this into item 2 would be required. <br />4. What is the anticipated time that the parking lot will be out of service? This timing is crucial <br />to our business and those businesses around the lot. We also know that the lot is used by <br />many not in the immediate area that also would be affected. Timing and length of time would <br />be information prudent in our operations so we can plan for the inconvenience. <br />5. It was noted that the spaces on each side of the blocked spaces on the South side of the lot in <br />front of the hardware store and just East on the same row are handicap spaces. Will the <br />Narrows be required to provide a handicapped space also? <br />6. Do you have an estimated cost that the City has come up with for the plan presented? <br /> <br />These are some items that I could come up with at this time. Please pass this email on. Thanks. <br /> <br />Gary Anderst <br />Confidentiality Notice: This e-mail and any attachment may contain confidential information <br />that is legally privileged. This information is intended only for the use of the individual or <br />entity named above. The authorized recipient of this information is prohibited from disclosing <br />this information to any other party unless required to do so by law or regulation. If you are not <br />the intended recipient, you are hereby notified any disclosure, copying, distribution or action <br />taken in reliance on the contents of these documents is strictly prohibited. If you have received <br />this transmission in error, please notify the sender immediately, reply to this transmission, or