Laserfiche WebLink
From:Christian Johnson <br />To:Jeremy Barnhart <br />Subject:Navarre parking lot <br />Date:Thursday, January 13, 2022 12:49:23 PM <br />Jeremy- <br />I received the proposed Navarre parking lot and have some comments. The design appears to <br />maximize the number of parking stalls. Do you have the current count vs proposed count? <br />Changing to one-way traffic pattern may take some getting used to but probably makes sense <br />given the limitations of the lot. <br />1. The marked loading zone for the loading dock and dumpster at my building (True Value) is <br />not wide enough. The loading zone needs to be 32' wide to allow a semi truck and other <br />vehicles to access my store. <br />2. The majority of vehicles that park in the lot are trucks and SUVs. I can't tell the width of <br />proposed stalls, but I'd like to see them at least 9.5' wide to accommodate these vehicles. Can <br />you verify the proposed width? <br />3. The drive lane on west end of lot shows one way, but there will be vehicles accessing lot <br />from Lulus Pizza entrance. The access to the first long strip of parking should be two way. If <br />you can eliminate the first parking stall (southwest corner of long stretch of parking) it would <br />allow for two way traffic and vehicles from both directions to make the turn into the long <br />stretch. <br />4. The proposed diagram shows pole lights in middle and north edge of lot. There are <br />currently pole lights on south edge of lot. The access to businesses is on the south edge of the <br />lot and I'd like to see these pole lights maintained. <br />Thank you. <br />Chris Johnson <br />Navarre True Value <br />952-200-9100 mobile