Application 2021 Fee Proposed Fee Escrow Notes
<br />City Administrator may require an erosion control
<br />escrow for projects disturbing soils.
<br />Not to Exceed
<br />$1,000
<br />Total Valuation
<br />$1.00 to $500
<br />$501.00 to $2,000.00
<br />$2,001.00 to $25,000.00
<br />$25,001.00 to $50,000.00
<br />$50,001.00 to $100,000.00
<br />$100,001.00 to $500,000.00
<br />$500,001.00 to $1,000,000.00
<br />$1,000,001.00 and up
<br />State Surcharge as required by State
<br />Demolition
<br />Demolition: Principal structure $100.00 $100.00 $1,000.00
<br />Demolition: Accessory structure/Septic system (Per
<br />unit fee)$50.00 $50.00 $1,000.00
<br />Retaining walls
<br /> Based on Value
<br />Table
<br /> Based on Value
<br />Table $1,000.00
<br /> May require City Council
<br />approval (Variance or CUP)
<br />Plumbing
<br />1.25% of project
<br /> 1.25% of project
<br />value, based on
<br />valuation table n/a
<br />Backflow registration $10.00 $10.00
<br />Plumbing minimum $26.25 $26.25
<br />Fee
<br />$26.25
<br />$26.25 for the first $500.00 plus $3.41 for each additional $100.00, or fraction thereof, to and
<br />including $2,000.00
<br />$6,254.92 for the first $1,000,000.00 plus $4.20 for each additional $1,000.00, or fraction thereof
<br />$77.40 for the first $2,000.00 plus $15.49 for each additional $1,000.00, or fraction thereof, to
<br />and including $25,000.00
<br />$433.67 for the first $25,000.00 plus $11.29 for each additional $1,000.00, or fraction thereof, to
<br />and including $50,000.00
<br />Valuation based on ICC 2012 Building Valuation tables
<br />$715.92 for the first $50,000.00 plus $7.88 for each additional $1,000.00, or fraction thereof, to
<br />and including $100,000.00
<br />$1109.92 for the first $100,000.00 plus $6.30 for each additional $1,000.00, or fraction thereof,
<br />to and including $500,000.00
<br />$3,629.92 for the first $500,000.00 plus $5.25 for each additional $1,000.00, or fraction thereof,
<br />to and including $1,000,000.00
|