Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Application 2021 Fee Proposed Fee Escrow Notes <br />Vehicle Storage $50.00 $50.00 78-1577 (C) <br />Land Alteration $50.00 $50.00 $1,000.00 May also require a CUP <br />Tent/ Canopy Permits $50.00 $50.00 <br />*City Administrator may require an erosion control <br />escrow for projects disturbing soils or tree <br />replacement. <br />$1,000.00 Variable depending on project <br />scope, but not to exceed <br />Zoning confirmation letter $50.00 $50.00 <br />Request for zoning confirmation <br />letter <br />Address Change Request by Owner $50.00 <br />Address Change Request by Owner $50.00 $50.00 Relocated <br />Building Permits <br /> Based on Value <br />Table <br /> Based on Value <br />Table <br />Building permit fees (Building, Plumbing, <br />Mechanical, unless otherwise noted) <br /> Based on 2012 <br />Building Valuation Recommended by BO <br />Plan Review Fee <br /> 65% of Building <br />Permit Fee <br /> 65% of Building <br />Permit Fee <br />Additional plan review required by changes, <br />additions, or revisions to approved plans <br /> minimum one half hour charge (does not apply to <br />commercial plumbing) <br /> $75.00 / hour <br />Recommended by BO <br />Minimum Fee $26.25 $26.25 <br />Moved-In Structure (not including foundation, <br />interior remodel, etc.)$275.00 $275.00 Recommended by BO <br />Pre-Move Inspection $165.00 Recommended by BO <br />Special investigation fee (work started without <br />obtaining a permit – applies even if no permit is <br />pulled) <br />100% of Building <br />permit fee <br />Recommended by BO <br />Manufactured Home Installation $275.00 plus State <br />Surcharge and requires a regular building permit <br />if also doing basement, foundation, garage or <br />entryway, fees are based on sq. ft. State Table <br />Recommended by BO <br />Recommended by BO <br />BUILDING CODE ADMINISTRATION: <br />Refunds: 80% of building permit fees on projects not yet started (within 90 days of permit <br />issuance by municipality). No refund on plan review fees, state surcharge or maintenance <br />permits