My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-08-2021 Council Packet
Orono
>
City Council
>
2021
>
03-08-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:40:34 AM
Creation date
1/14/2022 10:23:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Responsibility of the City of Orono. <br />1 . Perform all preconstruction building plan <br />reviews. <br />2. Perform all construction inspections <br />required for Building Code enforcement. <br />3 . Provide inspection reports and other <br />inforrnation for the permanent records kept by the City of <br />Minnetonka Beach. <br />4 . Assist in all Building Code violation <br />prosecutions with the Orono Building Official ' s time, records <br />and expert information. <br />5 . Provide general Building Code information <br />to the citizens of the City of Minnetonka Beach on the same basis <br />as provided the citizens of the City of Orono. <br />D. Procedure for Building Code Administration. <br />1 . The City of Minnetonka Beach reviews the zoning <br />requirements and site plan including building size, location <br />and use and certifies same to the Orono Building Official <br />as meeting the city' s approval . <br />2. The Orono Building Official reviews the <br />building construction plans for conformance with the Building <br />Code and approves, modifies or rejects same. The permittee <br />shall pay directly to the City of Orono a plan check fee in <br />the amount consistent with the current City of Orono fee <br />schedule. <br />3 . The City of Minnetonka Beach, upon approval <br />of the plan by the Orono Building Official and consistent with <br />all local requirements, issues the Building Permit, collects the <br />local and regional fees and notifies the City of Orono of the <br />permit date, number and other pertinent information. <br />4-
The URL can be used to link to this page
Your browser does not support the video tag.