My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-08-2021 Council Packet
Orono
>
City Council
>
2021
>
03-08-2021 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:40:34 AM
Creation date
1/14/2022 10:23:36 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
490
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: RJO Approved By: RJO <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this item is to accept the proposal for the utility design and engineer for <br />sewer and Water connections to the Future Public Works Facility Site. <br /> <br />2. Background. In 2020 the City Council expressed an interest in procuring land and constructing a <br />new public works facility. The City acquired the parcel at 365 OCB earlier this year. Council indicated <br />a desire to complete utility connections for the property in 2021 followed by soliciting proposals for <br />facility design later in the year. <br /> <br />3. Project Scope. The scope of the project will be to complete the design, permitting and prepare bid <br />documents for the construction of water and sanitary sewer lines to service the property at 365 Old <br />Crystal Bay Road. <br /> <br />4. Cost. The city solicited proposals from 2 engineering firms to complete design and engineering of the <br />Water and Sewer systems to the site. WSB provided the lowest quote for a fee not to exceed $28,736. <br />Summary of proposals is in the table below. <br />Firm Proposed Cost <br />WSB $28,736 <br />BMI $29,000 <br /> <br />5. Funding. Funding for the project would come from facility fund. <br /> <br />COUNCIL ACTION REQUESTED <br />Motion to accept the proposal from BMI for a fee not to exceed $28,736 for the design and engineering of <br />sewer and water utilities to serve the new public works facility. <br /> <br />Exhibits <br />A. Fee Proposal from WSB for Utility (Sewer and Water) Design Services. <br />B. Fee Proposal from Bolton and Menk for Utility (Sewer and Water) Design Services. <br /> <br /> <br />Item No.: 23 Date: March 8, 2021 <br />Item Description: Public Works Facility Approval of Utility Engineering and Design <br />Presenter: Adam T. Edwards, P.E <br />City Engineer/ Dir of Public Works <br />Agenda <br />Section: <br />Public Works Director/ <br />City Engineer Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.