My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-09-2020 Council Packet
Orono
>
City Council
>
2020
>
11-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:21:01 AM
Creation date
1/14/2022 10:06:50 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Prepared By: Reviewed By: Approved By: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is for Council approve change orders related to the Big <br />Island ADA Trail Project. <br /> <br />2. Background. In early 2017 the Big Island Committee was established to evaluate and develop plan <br />to improve the Park and meet the goals of the 2011 Big Island Management Plan. The group worked with <br />staff, consultants and coordinated with MCWD to develop a master plan to guide improvements at the <br />park. The Council approved the Big Island Master Plan on April 23, 2018. In 2019 the City Applied for <br />and received a MN DNR Outdoor Recreation Grant for Big Island. On October 28th, 2019 the Council <br />approved the Big Island Grant Agreement with the DNR. The City Awarded the base bid and Alternate #1 <br />(the vault toilet) in April of 2020. The project was then delayed for archeology and Federal Native <br />American consultation requirements though the summer and early fall of 2020. All of the requirements <br />were met at the end of October and the Project is currently under construction. Over this state legislative <br />session, the Mayor successfully got an entry added to state bonding bill for the city. The State Bonding <br />Bill which recently passed both houses of the legislature and was signed by the governor included <br />$300,000 for Orono’s Big Island Park Project: For a grant to the city of Orono to predesign, design, <br />construct, furnish, and equip improvements at Big Island ark, including a picnic area, trails and trail <br />gates, restrooms, permanent seating, and interpretive panels. The grant funds will be administered by the <br />Minnesota State Department of Employment and Economic Development (DEED). Staff has been in <br />contact with DEED and expects to get guidance on the process and limits associated with the funds soon. <br />The funding should be available in time to complete the original Big Island Project as designed including <br />the items that were previously differed due to lack of funding. This includes the picnic shelter and tables. <br />Staff will also be recommending that some of the funding be used to pay for the additional archeology <br />and design work required this past summer to get the final state and federal approvals for the project. <br /> <br />3. Project Scope. The original project scope consist of ADA accessible pathway, picnic shelter, <br />interpretive signage and an ADA compliant restroom facility. <br /> <br />4. Change Order Scope. Inclusion of the Picnic shelter and tables (Alternates 2-5), delay and <br />additional mobilization fees. Additional Archeology and associates construction mgmt. for change. <br /> <br />5. Cost. <br />Item Cost Comments <br />Construction Base Bid: Trails $ 212,460 Awarded in April 2020 <br />Construction Alternate 1: Vault Toilet $ 93,000 <br />Construction Alternate 5: ADA Picnic Tables $ 10,000 Previously approved/ match donated <br />3 Sitting stones for northern overlook $ 3,975 Previously approved/ match donated <br />Design and Archeology Costs $ 51,457 Previously approved <br />Construction Management $ 20,000 Previously Approved <br />City procured Items: Signage and painting $ 4,817 Does not include labor or admin costs <br />Construction Alternates 2-3: Picnic shelter $ 73,030 Change order <br />Construction Alternate 4: Picnic Tables $ 10,000 <br />Mobilization for Change order and delay costs $ 16,160 <br />Additional Archeology & Construction Mgmt $ 19,040 Not to exceed <br />PROJECT TOTAL $ 513,939 To date <br />Item No.: 18 Date: November 9 , 2020 <br />Item Description: Big Island Park ADA Trail Project (19-033) – Change Order <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Public Works and <br />Engineering <br />172 <br />172
The URL can be used to link to this page
Your browser does not support the video tag.