My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-13-2020 Council Packet
Orono
>
City Council
>
2020
>
07-13-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2022 10:05:02 AM
Creation date
1/14/2022 9:59:23 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br /> <br /> <br />Prepared By: Reviewed By: DJR Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to get Council approval to extending a sewer main to <br />service 1000 Brown Road and waive of sewer connection fees. <br /> <br />2. Background. The property owner at 1000 Brown Road has requested sewer service be extended to <br />service the property. The property’s does not have adequate septic sites. The property is in the <br />Metropolitan Urban Service Area (MUSA). The nearest city sewer main is a gravity main on the south <br />end of Willow Drive. <br /> <br />3. Sewer Connection Fee. Per the City Fee Schedule the sewer connection fee is $5,380.00. The <br />estimated cost for the sewer main extension is $20,600.00. In light of the cost to extend the main <br />exceeding the connection fee cost the homeowner requests the City waive the connection fee. <br /> <br />4. Funding. All cost associated with the construction of the sewer and service line will be paid by the <br />resident. Upon completion and acceptance by the City, ongoing maintenance of the sewer main portion <br />of the project will be the City’s responsibility. <br /> <br />6. Way Forward. If the council approves of the project the follow steps would follow: <br />• The resident will acquire the necessary permits Permit process (MPCA, MCES, MCWD, <br />Hennepin County) <br />• The City will complete the design review <br />• The resident will construct the sewer main and service line. <br />• The City will inspect and then accept the sewer main. <br /> <br />7. Staff Recommendation. After consideration of the proposed project, it is my recommendation to <br />approve the sewer extension and to waive the connection fees. <br /> <br />COUNCIL ACTION REQUESTED: <br />Consider a motion to approve the sewer extensions and to waive the connection fees. <br /> <br />Exhibits <br />A. Location map showing sewer extension. <br />Item No.: 10 Date: July 13th, 2020 <br />Item Description: Sewer Extension – 1000 Brown Road <br />Presenter: Adam T. Edwards, P.E. <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Consent Agenda
The URL can be used to link to this page
Your browser does not support the video tag.