Laserfiche WebLink
CITY of ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO. <br />The lot size for administe1ing accessory structure ordinances shall be the <br />actual lot area and shall not credit any of the Conservation Outlot area. <br />Additional Individual Lot Standards: <br />Lot 1: Thewesterly50'ofLot 1 issubjecttoaConservationEasement allowing <br />no structures or hardcover. The northerly yard ofLot 1 is designated as <br />a side street yard. The rear yard 50' setback is coincident with the <br />Conservation Easement boundary. <br />Lot 2: The westerly 50' of Lot 1 is subject to a Conservation Easement allowing <br />no structures or hardcover. The wester! y 5 0' yard of Lot 2 is designated <br />as a rear yard for zoning purposes. The westerly 50' setback is coincident <br />with the Conservation Easement boundary. The soulherlyyardofLot 2 <br />shall also be treated as a rear yard, and shall be subject to a 50' rear yard <br />setback and the 75' creek setback. No accessory structures shall be <br />placed within the 50' rear yards, nor within 75' of the creek. <br />Lot 3: The existing house setback to Lot 3 's northeasterly boundary shall <br />be recognized as a legal nonconformity. However, anynew construction <br />within Lot 3 shall conform to the standards established herein. The <br />southerly and southeasterly yards of Lot 3 shall be designated as rear <br />yards, and shall be subject to a 50' rear yard setback and the 75' creek <br />setback. No accessory strnctures shall be placed within the 50' rear yard, <br />nor within 75' of the creek. <br />Lot 6: There shall be no structural or hardcover encroacln11ents of the stmmwater <br />pond easement or the 35' wetland buffers. <br />Lot 7: There shall be no strnctural or hardcover encroachments of the storm water <br />pond easement, of the 35' wetland buffers, nor of the 30' drainage and <br />utility easement along the northwesterly boundary of Lot 7. <br />3. Tree Preservation and Landscaping. The developer shall adhere to the approved tree <br />preservation and landscaping plans. The developer shall walk the site with City staff p1ior <br />to site grading to establish which, ifany, trees within the grading area can be saved or <br />Page 4 of 8