<br />H:\ORNO\C13115486\z-LA18-0000.3_2745 Kelley Parkway\2745KelleyPkwy-1_2018-04-09.docx <br /> <br />April 24, 2018 <br />City of Orono <br />Attn: Adam Edwards <br />2750 Kelley Parkway <br />Orono, MN 55356 <br />RE: Site Plan Application #LA18-000036 <br />2745 Kelley Parkway <br />Engineering Review #1 <br />Dear Adam: <br />As requested, we have completed an engineering review of the documents submitted for the above <br />referenced project. We offer the following observations, comments, and recommendations for your <br />consideration: <br />1.The regional pond located to the east provides rate control for stormwater runoff from this <br />parcel. Due to rule changes since the pond’s construction though, stormwater management <br />measures must now be included to limit runoff volume and discharge of Total Suspend Solids <br />and Total Phosphorus to that of existing conditions. The proposed stormwater runoff <br />management plan will provide volume and pollutant control as required. <br />2.A separate City permit must be obtained for the sanitary sewer and water connections. <br />3.The condition of the regional pond east of the site must be reviewed by the City and Contractor <br />prior to any work. The pond bottom must be verified with survey prior to any work, and once <br />work commences, the Contractor shall be responsible for removing any sediment added to the <br />pond due to site construction. <br />4.The condition of Kelley Parkway and adjacent sidewalk must be reviewed by the City and <br />Contractor prior to any work and verified with video or pictures. Any damage to the street or <br />sidewalk after work commences shall be deemed to be caused by the Contractor and the <br />Owner’s responsibility to repair. <br />5.All work within public right-of-way and connections to watermain must be coordinated with <br />the City. Contractor must provide a minimum 48 hour prior notice. <br />6.All construction equipment must be parked on site. Clear drive lanes must be maintained on <br />Kelley Parkway at all times. <br />7.Temporary barricades must be installed at the west entrances to direct traffic through the rock <br />entrance until the site is permanently stabilized. <br />8.Drainage and Utility Easements must be revised to adequately cover utilities as follows: <br />a.Watermain, hydrants, and valves (except private service lines) <br />b.Stormwater management facilities used to meet governmental requirements <br />9.A 10’ trail easement must be provided adjacent to the south lot line. <br />10.Extent of removals at connections to existing pavement shall be coordinated in the field with <br />the City prior to any work. Concrete sidewalk removal limits shall be located at a joint. <br />Bituminous pavement should be saw-cut for clean match lines. <br />11.A concrete apron must be installed at the new connection to Kelley Parkway per City