My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2020 Council Packet
Orono
>
City Council
>
2020
>
03-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 3:29:35 PM
Creation date
1/12/2022 3:23:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2020 Street Improvements <br />Page 2 <br /> <br />H:\ORNO\C13119315\1_Corres\C_To Others\2020 Street Improvements Construction Services 3-04-20.docx <br /> <br />Fee Estimate <br />In addition to the fees for the construction phase of the project, additional design services were required <br />due to the change in scope for Togo Avenue from a mill and overlay to a full reconstruction. The fees <br />associated with this change is $29,000. Based on the scope of services described above, and the <br />additional design work, we propose a not-to-exceed of $124,000 to be billed on an hourly basis. A <br />separate proposal for materials testing services will be submitted to the City for Review. <br /> <br />Please let me know if you have questions or need additional information. <br /> <br />Sincerely, <br />Bolton & Menk, Inc. <br /> <br /> <br />David P. Martini, P.E. <br />Principal Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.