My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2020 Council Packet
Orono
>
City Council
>
2020
>
03-09-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2022 3:29:35 PM
Creation date
1/12/2022 3:23:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />H:\ORNO\C13119315\1_Corres\C_To Others\2020 Street Improvements Construction Services 3-04-20.docx <br /> <br />March 4, 2020 <br /> <br />City of Orono <br />Attn: Adam Edwards <br />PO Box 66 <br />Orono, MN 55323 <br /> <br />RE: 2020 Street Improvement Project - Construction Services <br /> <br />Dear Adam: <br /> <br />As requested, we have prepared a scope of services and estimated fee for the construction services <br />associated with the Street Improvement Project. <br /> <br />Scope of Services <br /> <br />Public Coordination/Communications <br />Bolton & Menk is committed to supporting the coordination requirements of this project with qualified <br />staff and will proactively engage affected property owners and the general public with timely and <br />accurate information via newsletters and website updates as desired by the City. <br /> <br />Construction Staking and Observation <br />Construction staking will be provided along with full time construction observation. Duties of the <br />Construction Observer will include the following: <br />• Attendance at the pre-construction meeting and all construction-related meetings <br />• Serve as a liaison between the City and the contractor <br />• Review of the completed work to determine if the project is in general conformance with the <br />plans and specifications <br />• Review of all materials testing <br />• Maintenance of construction documentation <br />• Communication with affected property owners, as necessary, to address their construction-related <br />concerns and issues <br /> <br />Construction Administration <br />Construction administration duties will include the following: <br />• Administering a pre-construction meeting and weekly construction meetings <br />• Review of shop drawings <br />• Preparation of pay estimates <br />• Contractor Communications <br />• Liaison with City Staff and Council <br /> <br />Record drawings detailing the completed improvements as recorded by the construction observer and the <br />City of Orono’s contractor will be completed and furnished to the City in hard copy and electronic format. <br />Record plans will also be linked to the City mapping system and the City’s GIS system will be updated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.