Laserfiche WebLink
<br /> <br />The lot areas noted above are assumptions based on the plans received January 13, 2020 and ignore <br />possible wetlands/ slopes, etc. that may reduce the calculable lot area: <br /> <br />In urban areas served by sanitary sewer, each lot must contain contiguous dry buildable land equal <br />to the minimum areas as prescribed in chapter 78 or half-acre, whichever is less (exclusive of <br />public and private rights-of-way, vehicular or pedestrian easements, surface areas below the <br />ordinary high water mark of any surface water wetlands or areas at or below the floodplain <br />elevation for a specific property), and have legal access to the building site without encroachment <br />of a wetland or floodplain area. <br />Dry buildable land is also defined in the city code as land area occurring within the property lines <br />of a parcel or lot, excluding drainage-ways, flowage areas, floodplains, wetlands, marshland or <br />slopes of 18 percent or greater. <br /> <br />Your engineer can confirm, but it appears that a substantial portion of 2474 Carman includes wetlands <br />and the southern parcels cannot meet the lot area requirements when water area, floodplains, and <br />wetlands are excluded. Variances will be required. <br /> <br /> <br />2. Access/ roads. The road from shoreline providing access to the lots will need to be within a 50 foot <br />wide outlot (for a private road). The paved surface will need to be 24 feet wide. The road will need to <br />terminate in a cul de sac. The County will need to approve the intersection location. I’m sure the County <br />will confirm, but the road should line up with Navarre Avenue on the north side of Shoreline. <br />The remaining parcels (south of the lagoon) do not have frontage on a public or private street. The shared <br />driveway serving 2470, 2474, and 2480 Carman Street will need to be improved to city standards as a <br />private street (50 feet of right of way, and a paved surface of 24 feet). The end of this road will need to <br />include a cul de sac. <br /> <br />3. Utilities. All lots will need to be served by the Sanitary sewer system. Utility trunk lines, if not at the <br />property, will need to be extended to the property at the developers expense. Stormwater management <br />will be necessary for a lot with 7 lots. <br /> <br />Area Width Conforming?Notes <br />West Side <br />Lot 1 14000 100 No, Area <br />Width is measured at <br />the narrowest street <br />frontage <br />Lot 2 23746 131 Yes <br />Remainder <br />property 29920 121 <br />No, Width and <br />Area 1 acre, 140 width <br />East Side <br />Lot 1 10000 100 No, Area <br />Width is measured at <br />the narrowest street <br />frontage <br />Lot 2 10000 100 No, Area <br />Lot 3 21300 121 No, Area <br />Remainder <br />Property 33000 160 <br />No, Width and <br />Area 1 acre, 140 width <br />Lot Analysis