Laserfiche WebLink
and pertinent Credit information. All Commercial activity must be shown on the MCES SAC-A <br /> form. <br /> 5.5.4.2 Requirements for Credits <br /> Credits are available(to be reported in the"Previous Use"part of the form)when a New Use is being <br /> established on the Site and the prior use is currently being remodeled,currently being demolished or <br /> was demolished and properly reported to MCES. Even if the Credit will be used right away, current <br /> Demolitions must be reported on the MCES SAC-D form.No Credits are generated until a New Use <br /> is declared on this form. Demolitions that occurred in a prior calendar year and have not been <br /> correctly reported on the MCES SAC-D form are not eligible for Credits. <br /> 5.5.5 MCES SAC-D Form - Demolition Declaration Report <br /> 5.5.5.1 Demolished Properties <br /> The MCES SAC-D form is required to document all Demolition activity. This form establishes a <br /> potential future Credit and is required to be submitted by January 30 of the year following the <br /> calendar year in which the Demolition permit is issued.For example, if a Demolition permit is issued <br /> in September 2014,the Demolition must be properly reported to MCES by January 30,2015. <br /> Demolitions must be reported to be creditable. If the MCES SAC-D form is not submitted within the <br /> required time period,the property is not eligible for a future Credit. Monthly reporting is <br /> recommended. <br /> 5.5.5.2 Valid Report <br /> The MCES SAC-D form is not valid without all columns filled in and the following attachments: <br /> • Commercial Demolitions must be accompanied by the MCES SAC-C form or a SAC <br /> Determination Letter <br /> • Industrial Property Demolitions must be accompanied by a MCES SAC Determination <br /> Letter. <br /> 5.5.5.3 Credits <br /> Potential Credits are subject to the following: <br /> • The SAC Credit for a property is based on SAC payment or Non-Conforming Demand(see <br /> Section 5.4.2.1), in SAC units.No Credit will be allowed if the property should have paid <br /> SAC but did not(except where the Non-Conforming Long Continuous Demand Credits <br /> apply) <br /> • Properties that paid SAC prior to 1987 but were never connected to the MDS,and for which <br /> the Community did not participate in the SAC Rebate Program during 1987-1989,will <br /> continue to be creditable if and when a connection occurs <br /> • If a discount or a waiver was applied,the Credits will be correspondingly reduced.For <br /> example if an Apartment complex received a 20%discount,then the potential Credit is 0.80 <br /> SAC for each unit demolished <br /> • No Credits are available if the property participated in the Council's 2000-2003 Inclusionary <br /> Housing SAC Waiver Program, or for any reason had SAC waived <br /> • No Credit is allowed if the building was previously not connected to a central sewer <br /> • No Credit is allowed if the Demolition was done in a prior year and not properly reported <br /> 5.5.5.4 Demolition Permit Required <br /> There must be a Demolition permit or other verifiable documentation to support the Credit claim. <br /> Page36 <br />