Laserfiche WebLink
Industrial Wastewater:Any solid, liquid or gaseous wastes, excluding domestic waste,resulting <br /> from any industrial,manufacturing, Commercial, institutional or business activity, or from the <br /> development,recovery,or processing of a natural resource.Any waste that is transported by a <br /> liquid waste hauler and disposed into public sewers is Industrial Wastewater. Any Leachate, <br /> contaminated groundwater,or surface water,with the exception of Inflow and Infiltration of clear <br /> water disposed into public sewers, is Industrial Wastewater. <br /> Inflow and Infiltration (UI):Infiltration is clear groundwater that seeps into sewer pipes through <br /> cracks or joints in the pipes and inflow typically originates from a single point,i.e. sump pumps, <br /> foundation drains, or storm water entering openings in the sewer access covers. MCES design <br /> standards allow for a certain amount of I/I;the remainder is excess I/I that reduces the capacity of <br /> the MDS and is subject to surcharge by MCES. See http://metrocouncil.org/Wastewater- <br /> Water/Funding-Finance/Rates-Charges/MCES-Inflow-and-lnfiltration-(1-1)-Program.aspx <br /> Leachate:Liquid that has originated within or has percolated through refuse or the protective cover <br /> of a landfill. <br /> Local Government Unit:See "Customer Community. " <br /> Local SAC:The actual total fee paid by or for the property or business owner(s)to the Community, <br /> which may include Metropolitan Council SAC passed on by the Community and any local add- <br /> on charges. These fees vary widely between Communities and could add substantially to the total <br /> SAC costs of a property or business owner. <br /> Long Continuous Demand:See "Continuous Demand. " <br /> Look-Back Period(LBP):This definition was used between 2010-2012,but is no longer used.The <br /> LBP was the period of time prior to a Determination that MCES looked at demand to determine <br /> applicable Credits when a SAC Determination occurred.The LBP was the seven full years prior <br /> to the new SAC Determination or permit issuance and that part of the current year up to the <br /> Determination or permit issuance.For example, if a permit was issued in July 2012,the LBP <br /> would have gone back to January 1,2005 (seven calendar years plus the portion of the year <br /> 2012). <br /> Maximum Demand:For Residential Properties this is 1 SAC unit=274 gallons per day of capacity <br /> availability. <br /> For Commercial Properties it is the highest Capacity Demand in SAC units,based on the actual <br /> SAC paid for the site at any time, less any SAC Credits removed from the Site by the <br /> Community. In addition,two unpaid Non-Conforming situations are recognized as establishing <br /> the demand(for possible Credit)on a Site.These Non-Conforming situations are: Grandparent <br /> Demand that has been in existence when SAC started(1973,with evidence from 1968-1978) and <br /> a Long Continuous Demand on a Site. In a Grandparent Demand situation it is also possible that <br /> a Community removed some Credits,reducing the capacity recognized for a Site. <br /> For Industrial Properties it is the Assigned SAC Baseline which is the highest recognized demand <br /> determined during a Capacity Demand Review or a special review that resulted in additional <br /> SAC being paid after the most recent Capacity Demand Review. <br /> Metropolitan Area:The seven county Metropolitan Area over which the Council has statutory <br /> jurisdiction pursuant to Minnesota Statutes section 473.121,as may be amended from time to <br /> time.Hanover and Rockford(in Hennepin County),New Prague(in Scott County), and <br /> Northfield(in Dakota County)are currently excluded from the Metropolitan Area. <br /> Page 4 <br />