Laserfiche WebLink
Page 6 <br />uses surround the property (Wayzata Blvd to the south, Senior Housing to the east, <br />and a gas station to the west.) If the parcel was not zoned RPUD, there would be <br />no hardcover limitation due to the site distance from lakes. <br />14. Easements Required. Standard perimeter drainage and utility easements around <br />all property boundaries will be required. Additional easement or property may be <br />requested by Hennepin County to permit expansion of the stormwater pond east of <br />the site, for Hennepin Council retention and treatment needs. <br /> <br />15. Trail. Connection to the trail along Wayzata Blvd is required. <br /> <br />16. 10% Private Park RPUD Requirement. The private recreation area of ‘10% of <br />the platted property’ required under the RPUD standards will be satisfied via <br />various amenities proposed by the applicant, including dog run, roof top deck, <br />community room, and exercise room. <br /> <br />17. Stormwater Management. Stormwater management is proposed to be provided <br />by the existing stormwater pond area east of the site. The stormwater facilities <br />will be subject to standard drainage easements. In addition to the City of Orono, the <br />Minnehaha Creek Watershed District have approval authority over the applicants’ <br />stormwater management plan. Final stormwater plans will be subject to the <br />recommendations and approval of the City Engineer. <br /> <br />18. The applicant has provided General Concept Plans and Preliminary Plat Drawings <br />attached to this Resolution as Exhibits A-1 through A-19 including: <br />Plans prepared by Loucks and Associates: <br />A1 – Preliminary Plat dated 5-19-21 <br />A2 – Existing Conditions Plan Sheet C1-1–dated 6-14-21 <br />A3 – Demolition Plan Sheet C1-2–dated 6-14-21 <br />A4 – Site Plan Sheet C2-1–dated 6-14-21 <br />A5 – Grading and Drainage Plan Sheet C3-1–dated 6-14-21 <br />A6 – SWPPP Sheet C3-2–dated 6-14-21 <br />A7 – SWPPP Notes Sheet C3-3–dated 6-14-21 <br />A8 – Utility Plan Sheet C4-1–dated 6-14-21 <br />A9 – Detail Sheets Sheet C8-1–dated 6-14-21 <br />A10 – Landscape Plan Sheet L1-1–dated 6-14-21 <br />A11 – Landscape Details Sheet L2-1–dated 6-14-21 <br />Plans prepared by Mohegan Hanson, Architect: <br />A12 – Title Sheet